FIELD: electric power engineering.
SUBSTANCE: proposed method of thermal power plant controlling relates to power engineering and can be used at nuclear power plants (NPP). Set engineering problem is solved by fact, that in thermal power plant, using, for example nuclear or hydrocarbon fuel, containing, at least one working medium circuit and turbine with electric generator on shaft, connected to power system, setting electric generator installed active power, forming task for active power, according to which taking portion of power specified generator power and using taken portion of power for circuit working medium additional heating, simultaneously reducing fuel consumption in proportion to taken part of power, and difference between electric generator preset power and taken part of power is supplied into power system.
EFFECT: technical result is high plant cyclic load capability at its simplification in general and, consequently, reduced duration of thermal power plant payback.
5 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
CONTROL DEVICE FOR THERMAL POWER PLANT | 2017 |
|
RU2637345C1 |
GAS TURBINE PLANT | 2016 |
|
RU2628851C1 |
DEVICE OF ELECTRICAL SUPPLY OF OWN NEEDS OF POWER STATION GENERATING SET | 2017 |
|
RU2671821C1 |
DUAL LOOP DEEP NUCLEAR POWER SYSTEM | 2023 |
|
RU2813198C1 |
DOUBLE-CIRCUIT NUCLEAR ENERGY SYSTEM WITH HYDROGEN-CONTAINING WORKING FLUIDS IN EACH CIRCUIT | 2022 |
|
RU2805457C1 |
NUCLEAR POWER UNIT FOR NUCLEAR-POWERED SHIPS | 2022 |
|
RU2805458C1 |
POWER GENERATING PLANT AND METHOD OF ITS OPERATION | 1997 |
|
RU2125171C1 |
AEROSTATIC AIRCRAFT | 2013 |
|
RU2526123C1 |
MODE OF EXPLOITING OF AN ATOMIC STEAM-TURBINE PLANT AND AN INSTALLATION FOR EXECUTING IT | 2003 |
|
RU2253917C2 |
DOUBLE-CIRCUIT NUCLEAR POWER PLANT FOR NUCLEAR-POWERED SHIPS | 2022 |
|
RU2804924C1 |
Authors
Dates
2016-12-10—Published
2015-07-08—Filed