FIELD: machine building.
SUBSTANCE: present invention relates to mining shovels. Specifically, present invention relates to mechanisms for adjustment of angle of inclination of dipper. Mining shovel adapted to dig a bank of material, mining shovel comprising a boom including an end, a hoist rope extending over end of boom, an elongated member articulated with boom, a dipper for engaging bank of material, a bail assembly and a pitch brace. Element contains first end and second end. Dipper is connected to second end of element and comprises a cutting edge. Bail assembly comprises a first end articulated with dipper, and a second end connected with hoist rope passing through boom. Pitch brace comprises a first end pivotally connected to bail assembly, and a second end pivotally connected with element.
EFFECT: invention solves task of increasing efficiency of shovel, and improving quality of operation of dipper in various conditions.
21 cl, 10 dwg
Title | Year | Author | Number |
---|---|---|---|
MINING SINGLE-BUCKET EXCAVATOR, A BOW ASSEMBLY AND A DIGGING UNIT FOR A MINING SINGLE-BUCKET EXCAVATOR | 2013 |
|
RU2746122C2 |
DIGGING UNIT FOR CABLE EXCAVATOR AND DIGGING TOOL FOR ROPE EXCAVATOR (VERSIONS) | 2013 |
|
RU2728111C2 |
EXCAVATOR WITH ROTARY BUCKET (VERSIONS), BUCKET AND METHOD OF MATERIAL DUMP SELECTIVE DIGGING | 2013 |
|
RU2607838C2 |
SINGLE-BUCKET EXCAVATOR WORKING EQUIPMENT | 0 |
|
SU692941A1 |
BALANCER FOR MINING SHOVEL | 2015 |
|
RU2681980C2 |
MECHANICAL SHOVEL | 0 |
|
SU1661285A1 |
SHOVEL EXCAVATOR | 0 |
|
SU1799414A3 |
POWER SHOVEL | 1991 |
|
RU2005855C1 |
METHOD OF WORKING PIT FACE AND IN-PIT CABLE EXCAVATOR TO THIS END | 2010 |
|
RU2455427C2 |
ROCKER ASSEMBLY | 2013 |
|
RU2632609C2 |
Authors
Dates
2017-01-10—Published
2013-01-30—Filed