FIELD: machine building.
SUBSTANCE: invention relates to closed rope production method, containing core and metal strands helically wrapped around it, wherein method includes connection of two cable ends in areas of splicing, formation of splicing assembly at each strand ends, which are inserted inside cable after local removal of core, wherein each splicing area is molded with polymer. Invention also relates to closed rope production method, in which ends of strands are molded with polymer before they are inserted inside cable.
EFFECT: invention also relates to closed rope produced according to invention, and its use as traction or traction-supporting rope.
13 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CABLE FIXING | 2018 |
|
RU2687981C1 |
GASKET CONTAINING EXTRUDED GRID AND METHOD OF ITS PRODUCTION | 2014 |
|
RU2635629C2 |
COMBO CABLE OR COMBINATION LOCKS | 2013 |
|
RU2617031C2 |
METHOD AND SYSTEM FOR MONITORING OF ELEVATOR ROPES CONDITIONS | 2013 |
|
RU2550058C1 |
ROPE FROM SYNTHETIC FIBRE WITH CONNECTION ELEMENT | 2009 |
|
RU2461695C2 |
INDUSTRIAL TISSUE COMPRISING EXTRUDED MESH AND METHOD OF ITS PRODUCTION | 2014 |
|
RU2639984C2 |
METHOD OF MAKING FIBRE-OPTIC METALLIC MODULE AND DEVICE TO THIS END | 2007 |
|
RU2371794C2 |
PLAITED TUBULAR PRODUCT AND METHOD OF CONNECTING PLAITED TUBULAR ARTICLE | 1999 |
|
RU2162495C1 |
AUTOMATED SYSTEMS AND METHODS OF MANUFACTURING SERRATED BRAIDED SUTURES | 2010 |
|
RU2557732C2 |
METHOD OF ERECTING HIGH-VOLTAGE OVERHEAD TRANSMISSION LINE AND HIGH-VOLTAGE OVERHEAD POWER TRANSMISSION LINE, BUILT USING SAID METHOD | 2015 |
|
RU2594197C1 |
Authors
Dates
2017-01-10—Published
2012-08-03—Filed