FIELD: machine building.
SUBSTANCE: group of inventions relates to deposits continuous removal system and method for removal of mechanical mixture from snow melting vehicle receiving container or melting tank. Deposits removing device for snow melting vehicle, having receiving container to receive snow load, subjected to processing into melt water inside receiving container, contains garbage collecting system for garbage displacement, falling on receiving container bottom, into collecting chamber arranged next to receiving container. Device also includes lifting system for garbage lifting from collecting chamber into higher position for garbage discharge by gravity beyond collection chamber.
EFFECT: technical result of group of inventions consists in providing of snow melting vehicle continuous operation.
21 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
STATIONARY SNOW MELTING PLANT | 2020 |
|
RU2727675C1 |
DEVICE FOR SNOW MELTING ALLOWING OPERATION WITH SNOW START | 2009 |
|
RU2428540C2 |
SNOW MELTING PLANT | 2021 |
|
RU2779302C1 |
MOBILE SNOW MELTING PLANT | 2018 |
|
RU2695676C2 |
WASTE RECEPTACLE VEHICLE | 2011 |
|
RU2484198C1 |
SNOW-MELTING MACHINE | 2015 |
|
RU2585064C1 |
SNOW-MELTING MACHINE | 2016 |
|
RU2628443C1 |
SNOW-MELTING PLANT | 2016 |
|
RU2621985C1 |
GARBAGE CONTAINER FOR BURIED GARBAGE COLLECTORS | 2011 |
|
RU2549095C2 |
SNOW MELTING DEVICE | 2007 |
|
RU2335597C1 |
Authors
Dates
2017-02-09—Published
2012-12-13—Filed