FIELD: construction.
SUBSTANCE: executive body of the oval-shaped shield complex comprises lateral working bodies that represent ovals formed by rotating about the vertical axis of the lateral tunnel arches and their coupling with the arch and the reverse arch of the tunnel. The front working body consists of three working bodies, each of which is formed by rotating about the horizontal axes of the arch and the reverse arch circles, wherein the intermediate working body is made concave. The gaps between them and the shield shell correspond to the working tool overhang, and the working tool is mounted with the displacement to the development magnitude.
EFFECT: provision of tunneling with the optimal oval cross-section shape, while reducing the costs for the rock development; provision of tunneling in various geological conditions at the large influx of water, creating the conditions for the maximum mechanization and automation of all production processes.
2 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
OPERATING MEMBER OF DRIVING SHIELD OF OVAL SHAPE | 2008 |
|
RU2376473C1 |
OVAL TELESCOPIC ACTUATOR OF TUNNEL SHIELD | 2010 |
|
RU2439327C2 |
EXECUTIVE TOOL OF DRIVING SHIELD | 2003 |
|
RU2244129C1 |
TUNNELING UNIT | 2021 |
|
RU2765746C1 |
METHOD FOR ERECTION OF VEHICULAR TRAFFIC TUNNEL OF URBAN RING HIGHWAY OF MEGAPOLIS | 1999 |
|
RU2152473C1 |
METHOD FOR ERECTING INTRA-CITY CIRCULAR MOTORWAY | 1999 |
|
RU2175367C2 |
METHOD FOR ERECTION OF URBAN RING HIGHWAY SECTION MEGAPOLIS | 1999 |
|
RU2152470C1 |
TUNNELING SHIELD COMPLEX FOR CONSTRUCTION OF BOX-SECTION TUNNELS | 1998 |
|
RU2130120C1 |
POWERED SHIELD COMPLEX FOR CONSTRUCTION OF TUNNELS WITH PREFABRICATED EMBEDDED IN ROCK LINING | 1988 |
|
RU2018677C1 |
METHOD FOR THE DEVELOPMENT OF MINERAL DEPOSITS BY AN UNDERGROUND METHOD USING TUNNEL-BORING MECHANIZED COMPLEXES | 2022 |
|
RU2801989C1 |
Authors
Dates
2017-03-23—Published
2015-11-13—Filed