FIELD: petroleum industry.
SUBSTANCE: invention refers to the petroleum industry and may be used during the acid processing of carbonate oil reservoirs with the water-oil contact in the wells with open horizontal shafts. According to the method, a well is performed or selected with the open shaft in a production carbonate reservoir. In this well, the sites of at least 2 m long are selected for processing. The acid processing is performed. For this purpose, a flexible coupling-free pipe with the paired packers on its end and the hydromonitor nozzle between the packers is descended into the shaft. After the descent of these pipes with packers and hydromonitor nozzles into the corresponding site, the packers are puckered. The solution of surface-active substance in the set volume is pumped through these flexible coupling-free pipes and hydromonitor nozzles. The soak period is performed. Then, a gel is pumped, which is selected according to the condition of impossibility of its pumping into a reservoir at a pressure, at which the acid will be pumped later, as well as capable for thickening after some period of time following its pumping into the open shaft of a well. The soak period is performed within the time required for subsidence of the gel into the bottom part of the shaft and its thickening. After that, the acid is pumped under pressure. The soak period is performed for the reaction of the acid solution with the reservoir. Then, the gel solvent is pumped into the well in the volume of at least equal to the volume of the pumped gel. The horizontal shaft of the well is washed; the packers are unpackered and remove from the well, as well as the flexible coupling-free pipe with the hydromonotor nozzle and packers.
EFFECT: increasing of process efficiency of the acid processing.
1 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD ACID TREATMENT FOR RESERVOIRS WITH WATER-OIL CONTACT | 2016 |
|
RU2642900C1 |
METHOD FOR INTERVAL ACIDISING OF HORIZONTAL WELL USING CARBONATE RESERVOIR | 2014 |
|
RU2554962C1 |
METHOD OF ACIDIZING BOTTOMHOLE FORMATION ZONE WITH CARBONATE RESERVOIR | 2017 |
|
RU2652412C1 |
WELL COMPLETION METHOD | 2014 |
|
RU2541986C1 |
METHOD OF INTENSIFICATION OF WELL OPERATION AFTER ITS CONSTRUCTION | 2019 |
|
RU2724705C1 |
HORIZONTAL WELL COMPLETION METHOD | 2015 |
|
RU2588108C1 |
METHOD OF MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN OPEN INCLINED WELL HOLE | 2017 |
|
RU2667561C1 |
WELL COMPLETION METHOD | 2014 |
|
RU2541988C1 |
PROCESSING OF FLOODED HORIZONTAL WELL WORKING OF CARBONATE FRACTURED POROUS RESERVOIR | 2013 |
|
RU2531985C1 |
METHOD FOR HORIZONTAL WELL BOTTOM ZONE INTERVAL TREATMENT | 2007 |
|
RU2318999C1 |
Authors
Dates
2017-03-29—Published
2016-06-25—Filed