FIELD: machine engineering.
SUBSTANCE: installation includes 1 separator with reducing device 2 and line 3 vapour feed pump, 4, 5 and 6 faucet cooler connected to the feed line 3 vapour separator. Installation may include multiple separators, installed on the feed line 7, with reducing inlet devices and vapour feed lines, connecting them with the mixers. At work installing the heated raw materials through 7 through the protection device 2 serves 1 separator with low pressure from which to deduce heavy residue and vapours that on line 3 serves the mixer 6 where absorb circulating condensate filed on line 8 pump 4 through 5 cooler. Outstanding quantity of condensate output with line installation 9.
EFFECT: simplified installation and reduced energy costs.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
VACUUM FRACTIONATION UNIT | 2016 |
|
RU2712583C2 |
INSTALLATION FOR THE PRODUCTION OF FUEL OIL BY DELAYED THERMAL CONVERSION | 2018 |
|
RU2744073C2 |
VACUUM PLANT | 2016 |
|
RU2637691C1 |
ELECTRICAL DESALTING UNIT | 2013 |
|
RU2525984C1 |
DEVICE FOR VACUUM FRACTIONATION | 2020 |
|
RU2735013C1 |
DELAYED FUEL OIL THERMAL CONVERSION UNIT | 2016 |
|
RU2615129C1 |
LOW-PRESSURE HEAVY HYDROCARBON GAS STRIPPING UNIT (VARIANTS) | 2017 |
|
RU2634897C1 |
METHOD AND DEVICE FOR GAS COMPRESSION | 2014 |
|
RU2550834C1 |
APPARATUS FOR LOW-TEMPERATURE DEPHLEGMATION WITH RECTIFICATION OF INTEGRATED PRODUCTION OF NON-WASTE FIELD GAS TREATMENT (VERSIONS) | 2019 |
|
RU2725989C1 |
OIL RESIDUAL DELAYED THERMAL CONVERSIOIN PLANT | 2016 |
|
RU2626321C1 |
Authors
Dates
2017-04-04—Published
2016-04-05—Filed