FIELD: oil and gas industry.
SUBSTANCE: fracturable well bore and water dispensing bore are constructed in a coal seam or in a permeable layer and both bores are sealed to withstand high pressure. Fracture equipment is attached and water is forced under pressure of not more than 3 MPa into the fracturable bore of 1 well, wherein water pump is turned off after 10 minutes of fracturable well bore hydraulic fracturing, thus stopping the hydraulic fracturing. Compressed air compressor for gas-phase fracturing of fracturable well bore is turned on and when the pressure reaches 3 MPa, the compressed air compressor is turned off, thus stopping the gas-phase fracturing. These operations are repeated many times, wherein when water flows from water dispensing well bore spaced from the side wall of fracturable well bore, the hydraulic fracturing is stopped, but the gas-phase fracturing is continued. When water stops flowing from the water dispensing bore or when gas blows through the water dispensing bore, the gas-phase fracturing is stopped. Then a gas discharge pipeline network is connected to the fracturable well bore and to the water dispensing bore for combustible gas recovery.
EFFECT: increased efficiency of combustible gas recovery method.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR EFFECTIVE DEVELOPMENT OF GAS DEPOSITS IN LOW-PERMEABLE ROCKS | 2013 |
|
RU2515776C1 |
OIL AND GAS, SHALE AND COAL DEPOSIT DEVELOPMENT METHOD | 2012 |
|
RU2518581C2 |
METHOD FOR DEHYDRATION AND OPERATION OF WELLS FOR PRODUCTION OF GAS FROM COAL BEDS | 2017 |
|
RU2735593C1 |
PREVENTION OF GEO-DYNAMIC EFFECTS AT UNDERGROUND DEVELOPMENT OF GAS-BEARING COAL SEAM | 2013 |
|
RU2539074C1 |
METHOD OF HYDROGEN FORMATION FROM COAL-BEARING LAYER | 2008 |
|
RU2396305C1 |
PROCESS OF OUTGASSING OF COAL FORMATION | 2001 |
|
RU2217593C2 |
METHOD OF HYDRAULIC FRACTURING OF COAL SEAM | 2001 |
|
RU2209968C2 |
METHOD TO APPLY ACTION TO COAL BED | 2004 |
|
RU2272909C2 |
HYDRAULIC FRACTURING METHOD | 2023 |
|
RU2802245C1 |
METHOD FOR SHALE GAS PRODUCTION | 2012 |
|
RU2503799C2 |
Authors
Dates
2017-04-18—Published
2014-02-18—Filed