FIELD: construction.
SUBSTANCE: method comprises arranging the sectional sludge pit with the double bonding, waterproofing the sludge pit walls and bottom, placing the drilling waste, pumping out the liquid phase followed by planting plants. Moreover, the sludge pit is divided into sections by jumpers of the trapezoidal shape, around the pit perimeter (except for the drilling rig side) the impervious trench is arranged, into which waterproofing film is laid, with the subsequent backfilling with soil and erecting the perimeter bonding with the height of at least 1.0 m above the sludge pit filling level, the sludge pit bottom and walls are insulated by clay solution with the thickness of not less than 0.1 m; drilling waste of the hazard class no higher than IV is placed in the sludge pit, the drilling waste surface in the sludge pit is not backfilled, but remains open to the ultraviolet sun radiation and air oxygen impact on the drilling waste. After the liquid phase clarification and the drilling waste consolidation, the liquid phase is pumped out, willow cuttings are planted on the shelves, bonding slopes and intersectional jumpers, cattail is planted on the water edge.
EFFECT: increased sludge pits reclamation efficiency.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF RECLAMATION OF DRILLING SLUDGE CULVERT | 2018 |
|
RU2702184C1 |
TECHNOGENIC SOIL AND METHOD FOR PRODUCTION THEREOF | 2019 |
|
RU2717250C1 |
RECLAMATION METHOD OF DRILLING SLUDGE PIT | 2013 |
|
RU2539470C1 |
SOIL-SLIME MIX | 2013 |
|
RU2522317C1 |
TECHNOGENIC SOIL | 2019 |
|
RU2725534C1 |
SUBTERRANEAN-SLURRY MIXTURE FOR RECLAMATION LAND AND METHOD OF SOIL RECULTIVATION USING MENTIONED ABOVE MIXTURE | 2015 |
|
RU2631391C2 |
METHOD FOR VERMIRECULTIVATION OF SLUDGE RESERVOIRS AND SOILS CONTAMINATED WITH PETROLEUM AND PETROLEUM PRODUCTS, COMPOUND FOR CLEANING SOIL FROM PETROLEUM AND PETROLEUM PRODUCTS | 1995 |
|
RU2119735C1 |
METHOD FOR TREATING DRILLING WASTE | 2020 |
|
RU2767535C1 |
DRILLING REJECT BURIAL METHOD | 2001 |
|
RU2201949C2 |
METHOD FOR RECLAMATION OF SLUDGE PITS UNDER CONDITIONS OF WARM PERIODS | 2018 |
|
RU2691797C1 |
Authors
Dates
2017-04-25—Published
2015-06-17—Filed