FIELD: blasting.
SUBSTANCE: method includes the cutting in two stages. The first stage is the implementation of the weak cross-section cut structure in the form of the notch, the depth of which is not less than 1/6 of the cut structure thickness, by the single-point initiation of the elongated cumulative charge (ECC), which is mounted on its surface at the certain focal distance, which together with the cross-section area of ECC is selected depending on the cut structure. The second stage includes placing of elastic charge BB over the notch, which is closed by the strut, which is the shell with the bulk substance and density 1.7-1.8 g/cm3, the cross-section of which exceeds the elastic charge BB cross-section at least in 10 times. Provide the elastic charge BB blasting at simultaneous initiating from one of the end faces with counter-directed impulses perpendicular to the notch.
EFFECT: increased cutting efficiency of the thick metal structures, including those from alloy steels.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
EXPLOSIVE CUTTING DEVICE | 2016 |
|
RU2606812C1 |
METHOD FOR EXPLOSION CUTTING OF HARD MATERIALS AND APPARATUS FOR PERFORMING THE SAME | 1997 |
|
RU2119398C1 |
METHOD OF BLAST CUTTING OF METALWORKS AND LINE SHAPED CHARGE FOR ITS REALIZATION | 1994 |
|
RU2091697C1 |
ELONGATED CUMULATIVE CHARGE AND METHOD OF ITS PRODUCTION | 2019 |
|
RU2706155C1 |
PROCESS OF BLAST CUTTING OF THICK-WALLED STRUCTURES | 1999 |
|
RU2200933C2 |
ELONGATED CUMULATIVE CHARGE | 2018 |
|
RU2693065C1 |
METHOD OF CONSTRUCTION CUTTING AND BLAST-WAVE GENERATOR | 1993 |
|
RU2105946C1 |
ELONGATED SHAPED CHARGE | 2006 |
|
RU2304271C1 |
RESOURCE-SAVING METHOD FOR REMOVAL OF MINE-TYPE STRUCTURES | 2016 |
|
RU2638047C1 |
METHOD OF CUTTING AMMUNITION IN DISPOSAL | 2011 |
|
RU2496092C2 |
Authors
Dates
2017-05-10—Published
2016-01-26—Filed