FIELD: blasting operations, blast cutting of metal, concrete and reinforced concrete structures of various forms and dimensions. SUBSTANCE: process of blast cutting of thick- walled structures includes placement of explosive charge on surface to be cut and its initiation carried out simultaneously by means of opposing pulses perpendicular to section over entire length. Auxiliary explosive charge is positioned on side surface of structure in point of anticipated cut and is time-initiated . Auxiliary explosive charge is worked into structure to be cut. Additional auxiliary explosive charge is placed on opposite side surface of cut structure. Explosive charges are initiated simultaneously or with delay. EFFECT: enhanced efficiency of blast cutting of thick-walled structures of various form and profile. 4 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
EXPLOSIVE CHARGES FOR CUTTING | 1992 |
|
RU2086896C1 |
LINEAR CHARGE | 1998 |
|
RU2144172C1 |
METHOD INVESTIGATING CONDITIONS OF PROGRESS OF EXPLOSION WITH INFLAMMATION OF EXPLOSIVE GAS ATMOSPHERE AND FACILITY FOR ITS IMPLEMENTATION | 2000 |
|
RU2209418C2 |
DETONATOR WITHOUT PRIMARY EXPLOSIVES | 1999 |
|
RU2200928C2 |
DEVICE FOR BREAKING OF PIPES | 1996 |
|
RU2119039C1 |
CHARGING MODULE OF CUMULATIVE PERFORATOR | 1999 |
|
RU2170338C2 |
SHAPED CHARGE | 1996 |
|
RU2104465C1 |
DEVICE FOR PIPE EXPLOSIVE CUTTING | 2001 |
|
RU2204689C2 |
CHARGING MODULE OF TUBULAR SHAPED-CHARGE PERFORATOR | 1996 |
|
RU2117139C1 |
METHOD FOR SAFE PACKAGE OF CUMULATIVE CHARGES FOR TRANSPORTATION | 1999 |
|
RU2175108C2 |
Authors
Dates
2003-03-20—Published
1999-11-22—Filed