FIELD: physics.
SUBSTANCE: method includes assembling a mobile complex of the arrow and traffic light controlling system on a railroad section, connecting the centralisation computers of the complex to the arrow and traffic light controlling system on a railroad section, connecting the unit of controlling the section freeness towards the road sensors mounted on the railroad section, providing the train pass on the railroad section by coordinated controlling arrows and traffic lights with the control computers considering the unit data of controlling the section freeness.
EFFECT: increasing the efficiency of the traffic recovery and the reliability of controlling arrows and traffic lights.
16 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
MOBILE COMPLEX MICROPROCESSOR CONTROL SYSTEM OF ARROWS AND LIGHTS OF RAILWAY SITE | 2016 |
|
RU2622522C1 |
MICROPROCESSOR CENTRALIZATION SYSTEM OF MPC-EL | 2017 |
|
RU2709068C1 |
MICROPROCESSOR CENTRALIZATION SYSTEM MPC-EL | 2018 |
|
RU2692739C1 |
ADAPTIVE TRAIN CONTROL SYSTEM | 2023 |
|
RU2818401C1 |
MODULAR RECOVERY POINT FOR SIGNALING, CENTRALIZATION ANDBLOCKING | 2019 |
|
RU2747520C1 |
MICROPROCESSOR SWITCHING SYSTEM | 2017 |
|
RU2648488C1 |
MODULAR RECOVERY POINT FOR TRAIN TRAFFIC CONTROL | 2022 |
|
RU2790210C1 |
SYSTEM AND METHOD FOR AUTOMATIC NOTIFICATION OF RAILWAY WORKERS | 2021 |
|
RU2773550C1 |
RAILROAD CENTRALIZED TRAFFIC CONTROL SYSTEM | 2019 |
|
RU2728199C1 |
BLOCK MICROPROCESSOR CENTRALIZATION (BMPC) | 2023 |
|
RU2803696C1 |
Authors
Dates
2017-06-14—Published
2016-04-22—Filed