FIELD: oil and gas industry.
SUBSTANCE: in order to implement the method, a tubing string equipped with a mounting nipple for installation of sampling equipment and the coupling for directing the flow of formation fluid at the tubing bottom are lowered into the well. After depression is created, the evaluation of inflow rate and presence of oil in the inflow is carried out. The time required for oil to fill the tubing below the nipple is calculated by the inflow rate, and the operation time of the sampler is determined. The method includes running equipment consisting of a mandrel for hermetic seating into the seat nipple on the tubing of shut-off valve together with the sampler and a deep self-contained thermomanometre. Air-tight fitting of equipment into the seat nipple is performed, thus shutting-off the tubing string by the plug-in equipment. This creates conditions for accumulation and selection of depth sample of formation oil in the well in close proximity to the formation top. The formation oil is directed through the coupling for directing the flow in drop-jet form at low depression into the tubing string space, the sample is separated and accumulated in the rated period under the shut-off valve and the deep sample of the formation oil is taken out by the sampler installed together with the shut-off valve.
EFFECT: providing sampling of representative samples of formation oil, the application of which is possible at non-flowing test facilities.
2 cl, 3 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF BOREHOLE AND WELLHEAD EQUIPMENT LAYOUT FOR WELL SURVEY ENVISAGING INJECTION OF INJECTION FLUID TO FORMATION AND EXTRACTION OF FLUIDS FROM FORMATION | 2013 |
|
RU2531414C1 |
METHOD FOR TREATMENT OF BOTTOMHOLE ZONE AND DEVELOPMENT OF WELLS AND JET INSTALLATION FOR IMPLEMENTATION THEREOF | 2021 |
|
RU2822423C2 |
METHOD OF DEVELOPMENT AND EXPLORATION OF WELLS AND OF INTENSIFYING OF OIL-GAS INFLUX OF HEAVY HIGH VISCOUS OILS AND FACILITY FOR IMPLEMENTATION OF THIS METHOD | 2007 |
|
RU2340769C1 |
DEVELOPMENT METHOD OF OIL WELLS (VERSIONS), AND PLANT FOR ITS IMPLEMENTATION (VERSIONS) | 2010 |
|
RU2471065C2 |
METHOD OF WELL COMPLETION, RESEARCH AND STIMULATION OF OIL-GAS INFLOWS AND DEVICE FOR ITS EMBODIMENT | 1998 |
|
RU2131023C1 |
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTI LAYER DEPOSIT AND DEVICE FOR REALIZING SAID METHOD | 2014 |
|
RU2594235C2 |
METHOD OF DEVELOPMENT OF COMPLEX DEPOSITS WITH LOW RESERVOIR PRESSURE AND TEMPERATURE | 2019 |
|
RU2710050C1 |
METHOD AND DEVICE FOR INITIATING INFLOW FROM STRATUM | 1993 |
|
RU2065948C1 |
METHOD OF CAUSING FLUID INTRUSION FROM WELL | 2011 |
|
RU2470150C1 |
METHOD FOR SIMULTANEOUS PRODUCTION OF FLUIDS PRONE TO TEMPERATURE PHASE TRANSITION | 2020 |
|
RU2740884C1 |
Authors
Dates
2017-11-28—Published
2016-10-17—Filed