FIELD: electricity-producing industry.
SUBSTANCE: small hydro power plant comprises the upper main accumulation pool, which is connected to the river bed and is attached to the retention basin inlet by dint of the head conduit through the control gate of the upper circuit and through the orthogonal hydro turbine, which is located at the turbine pit. The retention basin is attached to the river bed below the upper main accumulation pool inlet through the suction pipe, the turbine pit with the orthogonal hydro turbine and the lower circuit control gate. The orthogonal hydro turbine is attached to the consuming electrical network, and the control gates of the upper and lower circuit are linked to the gate-operating gear. The upper main pool and the retention basin represent the interconnected vessels.
EFFECT: providing the generation of the constant electric energy, that is superior to the influx consumption, in case of the operating expenses in the turbine pit.
3 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
HYDRO-ELECTRIC POWER PLANT | 2011 |
|
RU2457357C2 |
COMPOSITE MOBILE DERIVATIONAL WATER CONDUIT AND METHOD OF ITS CONSTRUCTION | 2015 |
|
RU2607650C2 |
HYDROELECTRIC STATION BUILDING AND METHOD FOR ERECTION OF HYDROELECTRIC STATIONS | 2000 |
|
RU2185478C2 |
HYDROELECTRIC POWER GENERATOR | 2015 |
|
RU2628942C2 |
RIVER HYDRO WIND POWER PLANT (HWPP) | 2015 |
|
RU2612499C2 |
HYDRAULIC POWER-GENERATING PLANT | 2006 |
|
RU2307949C1 |
DEVICE FOR ACCELERATION OF LOW-POTENTIAL WATER FLOW OF FREE-FLOW MICROHYDROELECTRIC POWER PLANT | 2015 |
|
RU2592953C1 |
CASCADE HYDROELECTRIC POWER PLANT | 2011 |
|
RU2483159C1 |
METHOD OF ELECTROLYTIC COPPER PRODUCTION | 0 |
|
SU1767036A1 |
VORTEX HYDRAULIC TURBINE | 2017 |
|
RU2659837C1 |
Authors
Dates
2017-12-20—Published
2016-02-24—Filed