FIELD: construction.
SUBSTANCE: method of transformation is to remove the ballast from the section that passes through a lot of sleepers, removed a number of sleepers after dismantling the rail mounts to install sleeper blocks, to install temporary vertically adjustable supports in the area passing through a number of sleeper blocks, pouring the concrete from the surface of the under rails up to high of sleeper blocks. After the filling concrete has partially solidified, at least a portion of each support located between the two corresponding sleeper blocks in the direction of the rails is removed. The sleeper block for carrying out the method consists of a concrete panel and sleepers embedded in a concrete panel, which are provided with rail fasteners. The support for carrying out the method consists of a support body and a carrier plate for the rail. In this connection, adjusting means are provided for adjusting the distance between the support body and the support plate.
EFFECT: transformation of the railway track.
15 cl, 11 dwg
Title | Year | Author | Number |
---|---|---|---|
RAILROAD TRACK LONGITUDINAL SLEEPER ASSEMBLY | 2019 |
|
RU2722522C1 |
RAILWAY RAIL LENGTH (VERSIONS) | 2007 |
|
RU2381317C2 |
TRACK UPPER STRUCTURE DESIGN | 2007 |
|
RU2352706C1 |
METHOD FOR INSTALLATION OF PERMANENT WAY | 2007 |
|
RU2352705C1 |
PRESTRESSED REINFORCED CONCRETE SLAB FOR RAILWAY ROADS | 2007 |
|
RU2373317C2 |
RAIL TRACK | 1998 |
|
RU2149936C1 |
UNDERRAIL TRACK STRUCTURE | 1993 |
|
RU2066721C1 |
REINFORCED CONCRETE UNDERRAIL BASE AND METHOD OF ITS CONSTRUCTION | 2004 |
|
RU2250279C1 |
DESIGN OF TRACK SUPERSTRUCTURE OF BIKBAU UNDERGROUND | 2013 |
|
RU2535806C2 |
REINFORCED CONCRETE SLEEPER | 2005 |
|
RU2293810C1 |
Authors
Dates
2018-01-18—Published
2013-12-06—Filed