FIELD: rail track structure arrangement. SUBSTANCE: rail track has rail-and-sleeper combination 6 installed on base 5 through sole chairs. Base includes selection of resilient members in the form of rings. Supporting sleeper plates 1 are of circular configuration. Plates are made by cutting out sides of heavy motor truck tyres. Plates are installed horizontally in one layer over entire width of rail track. Two parallel segment cuts are made in each tyre. Coefficient of compensation of dissipative forces of rail track bases for supporting sleeper plates is determined by value of K= 0.79-0.85. Application of aforesaid arrangement of rail track helps cutting input of materials. EFFECT: higher efficiency. 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR RECLAMATION OF TYRES OF HEAVY- DUTY TRUCKS | 1998 |
|
RU2144462C1 |
RAILWAY RAIL LENGTH (VERSIONS) | 2007 |
|
RU2381317C2 |
PRESTRESSED REINFORCED CONCRETE SLAB FOR RAILWAY ROADS | 2007 |
|
RU2373317C2 |
METHOD FOR INSTALLATION OF PERMANENT WAY | 2007 |
|
RU2352705C1 |
RAILROAD CROSSING | 2022 |
|
RU2807945C1 |
TRACK UPPER STRUCTURE DESIGN | 2007 |
|
RU2352706C1 |
RAILWAY PADDLAY | 2021 |
|
RU2765269C1 |
DESIGN OF TRACK SUPERSTRUCTURE OF BIKBAU UNDERGROUND | 2013 |
|
RU2535806C2 |
RAILWAY SLEEPER | 2007 |
|
RU2340716C1 |
RAILWAY CROSSING | 2020 |
|
RU2764759C1 |
Authors
Dates
2000-05-27—Published
1998-07-17—Filed