METHOD OF OPERATION OF THE COMPRESSED-AIR POWER STATION Russian patent published in 2018 - IPC F01K25/06 

Abstract RU 2647013 C1

FIELD: heat-and-power engineering.

SUBSTANCE: invention relates to heat engineering. Method of operation of the compressed-air power station is characterized by the fact that the outgoing gases after the gas turbine enter the recovery boiler, which is a part of an additional installed waste treating circuit. One part of the steam produced by the recovery boiler is supplied for expansion and work performance into the steam turbine as part of an additional installed waste treating circuit, steam exhausted after the steam turbine is sent to the condenser, the condensate from the condenser is pumped to the recovery boiler by a condensate pump. Other part of the steam generated by the recovery boiler is supplied for injection into the combustion chamber of the gas turbine, thereby increasing the consumption of combustion products through the flowing part of the gas turbine. Compressed air is heated in the regenerator, with the exhaust gases after the recovery boiler. Invention makes provides increased electric power of the compressed-air power station by increasing the electric power of the steam turbine as part of an additional installed waste treating circuit, using the excess heat of the exhaust gases of the gas turbine, and also by increasing the power of the gas turbine by injecting a portion of the steam, produced by the recovery boiler as part of an additional installed waste treating circuit using the excess heat of the exhaust gases of the gas turbine.

EFFECT: invention makes provides increased electric power of the compressed-air power station by increasing the electric power of the steam turbine as part of an additional installed waste treating circuit.

1 cl, 1 dwg, 1 tbl

Similar patents RU2647013C1

Title Year Author Number
METHOD FOR OPERATION OF THE WATER TREATMENT PLANT AS PART OF THE COMPRESSED-AIR POWER STATION HEAT RECOVERY CIRCUIT 2022
  • Novichkov Sergej Vladimirovich
  • Rostuntsova Irina Alekseevna
  • Grigorev Evgenij Sergeevich
RU2790509C1
METHOD OF OPERATION OF THE COMPRESSED-AIR POWER STATION WITH AN ABSORPTION LITHIUM BROMIDE REFRIGERATING SYSTEM (LBRS) 2017
  • Aminov Rashid Zarifovich
  • Novichkov Sergej Vladimirovich
  • Borodin Andrej Aleksandrovich
RU2643878C1
POWER CHEMICAL PLANT FOR PRODUCING SYNTHESIS GAS, ELECTRIC AND HEAT ENERGY 2018
  • Sotnikov Dmitrij Gennadevich
  • Mrakin Anton Nikolaevich
RU2693777C1
METHOD FOR OPERATION OF BINARY COMBINED CYCLE POWER PLANT 2016
  • Novichkov Sergej Vladimirovich
RU2631961C1
METHOD OF WORK OF BINARY STEAM HEAT ELECTROCENTRAL 2016
  • Novichkov Sergej Vladimirovich
RU2626710C1
METHOD OF BINARY CCP-THERMAL POWER PLANT 2015
  • Novichkov Sergej Vladimirovich
  • Popova Tatyana Ivanovna
RU2600666C1
OPERATION METHOD OF A COMPRESSOR STATION OF MAIN GAS PIPELINES 2015
  • Khrustalev Vladimir Aleksandrovich
  • Larin Evgenij Aleksandrovich
  • Novikova Margarita Vitalevna
RU2647742C2
METHOD OF AND PLANT FOR RECOVERY OF HEAT IN CONTACT-TYPE STEAM-GAS PLANT 2002
  • Shadek E.G.
  • Shterenberg V.Ja.
  • Maslennikov V.M.
  • Iki Norikhiko
  • Tsalko Eh.A.
  • Vyskubenko Ju.A.
  • Kashfraziev Ju.A.
RU2211343C1
COMBINED MANEUVERABLE POWER PLANT 2022
  • Kosenko Aleksandr Sergeevich
  • Nikolaev Yurij Evgenevich
  • Vdovenko Ivan Anatolevich
RU2784570C1
METHOD TO INCREASE EFFICIENCY OF GAS-TURBINE PLANT 2002
  • Kirilenko V.N.
  • Brulev S.O.
  • Ivanov V.V.
RU2229030C2

RU 2 647 013 C1

Authors

Novichkov Sergej Vladimirovich

Dates

2018-03-13Published

2017-02-27Filed