FIELD: construction.
SUBSTANCE: invention relates to scheme for construction of integrated group of excavations for underground nuclear power plant in direction of mountain depth. Construction scheme contains production (1) for working block of nuclear reactor, two combined workings, two outputs (2) for working unit of electrical equipment, two pressure relief workings (7), the first main transport trunk (8), the second main transport trunk (9) and the third main transport trunk (10), with three main transport trunks communicating with earth's surface. Production (1) for working block of nuclear reactor, combined outputs, production (2) for working unit of electrical equipment and production (7) of pressure relief form group of underground excavations for blocks of radiation part of nuclear power plant. Dome top supports or dome wall support of each production from group of underworkings for placement of radiation part of nuclear power plant are communicated with earth's surface through support system of production located in upper layer. Lower parts of side walls of each production from group of underground workings for blocks of radiation part of nuclear power plant are connected with three main transport shafts through production support system located in lower layer.
EFFECT: construction scheme has reduced area, high safety, it is convenient in construction, provides savings of investments, high degree of modularity and can be widely applied in construction engineering of nuclear power facilities.
7 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
CONSTRUCTION SCHEME OF GROUP OF UNDERGROUND WORKINGS FOR INSTALLATIONS OF RADIATION PART OF UNDERGROUND NUCLEAR POWER PLANT LOCATED PERPENDICULARLY TO DIRECTION OF MOUNTAIN INLAND | 2015 |
|
RU2648775C1 |
RINGS CONSTRUCTION SCHEME OF UNDERGROUND WORKINGS GROUP OF RADIATION PART OF UNDERGROUND NUCLEAR POWER PLANT | 2015 |
|
RU2651820C1 |
METHOD OF LIFTING AND TRANSPORTING LARGE PARTS OF AN UNDERGROUND NUCLEAR POWER PLANT | 2015 |
|
RU2655088C1 |
METHOD OF LOADING OF UNDERGROUND WORKINGS | 1987 |
|
SU1501665A1 |
PROTECTION SYSTEM OF UNDERGROUND NUCLEAR POWER PLANT FROM UNDERGROUND MIGRATION OF RADIOACTIVE LIQUID WASTE | 2015 |
|
RU2648364C1 |
UNDERGROUND NUCLEAR POWER STATION | 2001 |
|
RU2273901C2 |
LEVELLING-OUT BASIN | 0 |
|
SU1067134A1 |
METHOD OF BURIAL OF ECOLOGICALLY HAZARDOUS OBJECTS | 1992 |
|
RU2012079C1 |
METHOD OF EXPOSING AND MINING VEINS | 0 |
|
SU1752955A1 |
SYSTEM CLEARING EFFECTS OF ACCIDENT AT ATOMIC POWER STATION | 1990 |
|
RU2032947C1 |
Authors
Dates
2018-03-30—Published
2015-05-27—Filed