FIELD: mining industry. SUBSTANCE: prior to feeding the oxidizer to working 1, crystallizers 3 are installed at a distance equal to 0.4 to 1.0 of the height of working 1 from one another so as to intensify the process of crystallization of oxidizer from its solution. Oxidizer is preliminarily dissolved in water with formation of supersaturated solution, in which with obtained solution, in which solid-to-liquid ratio attains 1:1.3. Working 1 is filled with obtained solution, and water evaporation on crystallizers 3 and on the walls of working 1 is accomplished by air stream 4, with settling and crystallization of oxidizer. Then ignitable component of explosive mixture is placed in working 1, fuze-detonating cord is installed, connecting line of detonating cord is laid, and tamping is accomplished. EFFECT: reduced labour content is loading of remote difficult-to get at workings, enhanced safety and improved hygienic conditions of loading. 2 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR FORMATION OF EXPLOSIVE CHARGE | 1986 |
|
SU1464653A1 |
METHOD FOR ROCK LOOSENING BY BLASTING | 1987 |
|
SU1520971A1 |
METHOD FOR FORMATION OF CHAMBER CHARGES | 1988 |
|
SU1603919A1 |
EXPLOSIVE CHARGE FORMATION METHOD | 2009 |
|
RU2416781C1 |
METHOD FOR LOADING WATERED RISING WELLS | 2008 |
|
RU2362970C1 |
METHOD FOR LOOSENING ROCKS BY BLASTING | 1989 |
|
SU1681633A1 |
PROCESS OF AMMUNITION DESTRUCTION WITH USE OF ENERGY OF CHARGES AND METAL OF BODIES | 1997 |
|
RU2130166C1 |
PROCESS OF THROWING DAM ACROSS CANYON BY BLAST | 1997 |
|
RU2122066C1 |
MIXING-CHARGING MACHINE FOR ROBOTIZED TECHNOLOGY OF CREATION OF WELL CHARGES WITH VARIABLE ENERGY SATURATION AND METHODS FOR FORMATION OF DETONATION SYSTEMS BASED ON THEM | 2019 |
|
RU2789093C2 |
METHOD OF CHARGING OF DESCENDING BLAST HOLES WITH HOT-FLOWING WATER-CONTAINING EXPLOSIVES | 1994 |
|
RU2100773C1 |
Authors
Dates
1995-10-10—Published
1987-12-17—Filed