FIELD: construction.
SUBSTANCE: ring scheme for construction of production group for radiation part of subterranean nuclear power plant, containing (1) power plants for nuclear reactor, generating (2) power plants for electrical equipment, generating (3) power stations for safety, generating (6) power plants for atomic auxiliary facility, production (4) power plants for nuclear fuel, connection workings (5) power plants. First main transport tunnel (8), the second main transport tunnel (9), the third main transport tunnel (10), the fourth main transport tunnel (7) and the main steam channel (11); generation (1) power plant for nuclear reactor, production (2) power plants for electrical equipment, generation (3) power stations for safety, production (6) of electrical installation for atomic auxiliary installation, production (4) power plants for nuclear fuel and interconnections (5) power plants form group of underground workings for installations of radiation part of nuclear power plant; theel of upper arch or end wall of upper arch of each generation in group of underground workings for installations of radiation part of clear power plant is communicated with earth's surface through upper level of branching tunnels system; and lower parts of side walls of each generation in group of underground workings for nstallations of radiation part of nuclear power plant are connected to each main transport tunnel and main steam channel through lower level of branching tunnels system.
EFFECT: group of underground workings of construction scheme described above has short distances, satisfactory safety and high degree of modularity, is convenient for construction and saves investments.
6 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
CONSTRUCTION DIAGRAM OF UNITED GROUP OF UNDERGROUND NUCLEAR POWER PLANT PRODUCTIONS IN DIRECTION OF MOUNTAINS DEPTH | 2015 |
|
RU2649193C1 |
CONSTRUCTION SCHEME OF GROUP OF UNDERGROUND WORKINGS FOR INSTALLATIONS OF RADIATION PART OF UNDERGROUND NUCLEAR POWER PLANT LOCATED PERPENDICULARLY TO DIRECTION OF MOUNTAIN INLAND | 2015 |
|
RU2648775C1 |
METHOD OF LIFTING AND TRANSPORTING LARGE PARTS OF AN UNDERGROUND NUCLEAR POWER PLANT | 2015 |
|
RU2655088C1 |
PROTECTION SYSTEM OF UNDERGROUND NUCLEAR POWER PLANT FROM UNDERGROUND MIGRATION OF RADIOACTIVE LIQUID WASTE | 2015 |
|
RU2648364C1 |
METHOD OF LOADING OF UNDERGROUND WORKINGS | 1987 |
|
SU1501665A1 |
UNDERGROUND NUCLEAR POWER STATION | 2001 |
|
RU2273901C2 |
UNDERGROUND NUCLEAR POWER PLANT BUILT AROUND SHIPBOARD REACTOR UNITS | 2002 |
|
RU2222839C2 |
UNDERGROUND NUCLEAR POWER STATION AND ITS SERVICING PROCEDURES | 2002 |
|
RU2218614C2 |
ENGINEERING CONSTRUCTION FOR FACILITIES OF UNDERGROUND ENERGY AND UNDERGROUND VERTICAL SECTIONS OF TRANSPORT SYSTEMS | 2014 |
|
RU2595255C2 |
UNDERGROUND NUCLEAR HYDRO-ACCUMULATING HEAT ELECTRIC STATION (VERSIONS) | 2017 |
|
RU2643668C1 |
Authors
Dates
2018-04-24—Published
2015-05-27—Filed