Abstract RU 2662009 C1

FIELD: oil and gas industry.

SUBSTANCE: gas turbine pumping unit of the compressor station of the main gas pipeline contains a gas turbine plant with a compressor, a combustion chamber, a gas turbine and an evaporative cooler. Evaporative cooler is installed in front of the compressor of the gas turbine plant and is equipped with a feeder, a water collection chamber and cooling elements located in the flow channel of the airflow and consisting of vertical cooling plates with a hydrophilic coating to which water is supplied by the supply device. Gas turbine pumping unit is additionally equipped with a water gas cooler, an air heat exchanger with fans, a chemical water treatment plant. Evaporation cooler water collection chamber is connected by a chilled water pipeline into which additional make-up water is supplied from the water treatment plant, with the input of a water cooler whose output is connected by a heated water pipe to the air heat exchanger and through the injection line with the evaporative cooler feeder.

EFFECT: invention makes it possible to increase the power and economy of gas pumping units.

1 cl, 1 dwg

Similar patents RU2662009C1

Title Year Author Number
METHOD FOR OPERATION OF GAS TURBINE GAS PUMPING UNIT AND DEVICE FOR ITS IMPLEMENTATION 2021
  • Shabanov Konstantin Yurevich
  • Osipov Pavel Gennadevich
  • Sheludko Leonid Pavlovich
  • Pleshivtseva Yuliya Edgarovna
  • Biryuk Vladimir Vasilevich
RU2791380C1
METHOD OF OPERATION OF COMBINED UTILIZATION GAS TURBINE UNIT OF GAS PUMPING UNIT OF COMPRESSOR STATION OF MAIN GAS PIPELINES 2022
  • Gordeev Andrej Anatolevich
  • Osipov Pavel Gennadevich
  • Sheludko Leonid Pavlovich
RU2802352C1
COMPRESSOR STATION OF THE MAIN GAS PIPELINE WITH A GAS TURBO EXPANDER UNIT 2021
  • Gordeev Andrej Anatolevich
  • Osipov Pavel Gennadevich
  • Sheludko Leonid Pavlovich
RU2795803C1
OPERATING METHOD OF THE COMPRESSOR STATION OF THE MAIN GAS PIPELINE 2022
  • Sheludko Leonid Pavlovich
  • Pleshivtseva Yuliya Edgarovna
  • Temnikov Egor Alekseevich
  • Osipov Pavel Gennadevich
RU2801441C2
GAS DELIVERING UNIT 0
  • Lozhkin Aleksandr Nikolaevich
  • Vasilev Yurij Nikolaevich
  • Vanyushin Yurij Nikolaevich
SU729379A1
COMPRESSOR STATION OF MAIN GAS LINE WITH GAS TURBINE EXPANDER POWER PLANT 2014
  • Subbotin Vladimir Anatolevich
  • Korneev Sergej Ivanovich
  • Shurukhin Igor Nikolaevich
  • Shabanov Konstantin Jurevich
  • Sheludko Leonid Pavlovich
RU2576556C2
MODE OF GAS TURBINE PLANT OPERATION ON METHANE-CONTAINED STEAM-GAS MIXTURE AND ITS ACTUALIZATION DEVICE 2016
  • Subbotin Vladimir Anatolevich
  • Shabanov Konstantin Yurevich
  • Sheludko Leonid Pavlovich
  • Biryuk Vladimir Vasilevich
  • Knysh Yurij Alekseevich
  • Tsybizov Yurij Alekseevich
  • Larin Evgenij Aleksandrovich
RU2639397C1
GAS TURBINE EXPANDER POWER PLANT OF COMPRESSOR STATION OF MAIN GAS LINE 2015
  • Subbotin Vladimir Anatolevich
  • Grabovets Vladimir Aleksandrovich
  • Shabanov Konstantin Yurevich
  • Sheludko Leonid Pavlovich
RU2599082C1
METHOD FOR COMBINED-CYCLE STEAM-AND-GAS PLANT OPERATION 2015
  • Biryuk Vladimir Vasilevich
  • Larin Evgenij Aleksandrovich
  • Livshits Mikhail Yurevich
  • Lukachev Sergej Viktorovich
  • Sheludko Leonid Pavlovich
RU2621448C2
REFRIGERATING GAS PUMPING UNIT 0
  • Gritsenko Aleksandr Ivanovich
  • Vasilev Yurij Nikolaevich
  • Muzhilivskij Petr Mikhajlovich
  • Zarnitskij Georgij Emmanuilovich
  • Shalimov Aleksandr Alekseevich
  • Korablin Vladimir Vasilevich
SU826160A1

RU 2 662 009 C1

Authors

Shabanov Konstantin Yurevich

Shurukhin Igor Nikolaevich

Sheludko Leonid Pavlovich

Gulina Svetlana Anatolevna

Dates

2018-07-23Published

2017-09-19Filed