FIELD: oil and gas industry.
SUBSTANCE: invention relates to method of gradual well production intensification. Method includes creation from measured well data of the set of quality parameters out of multiple diagrams, modelling method use for combination of set of quality parameters to create summary quality parameter, use of modelling method for combination of the summary quality parameter with stress data to make combined stress and summary quality index, at that the combined stress and summary quality index contains set of blocks with borders between them, identification of classifications for set of blocks, determination of areas according to combined stress and summary quality index based on the classifications, and well perforation at selected areas based on the classification.
EFFECT: increased intensification of well production.
9 cl, 14 dwg
Title | Year | Author | Number |
---|---|---|---|
SYSTEM AND METHOD OF WELL PRODUCTION INTENSIFICATION | 2011 |
|
RU2569116C2 |
SYSTEM AND METHOD FOR PERFORMING DOWNHOLE STIMULATION OPERATIONS | 2014 |
|
RU2663011C2 |
PRODUCTION SIMULATION METHOD AND SYSTEM | 2012 |
|
RU2567067C1 |
SYSTEM AND METHOD FOR PERFORMING OPERATIONS FOR STIMULATION OF RESOURCES | 2013 |
|
RU2591857C1 |
DEVICE, METHOD AND SYSTEM OF STOCHASTIC INVESTIGATION OF FORMATION AT OIL-FIELD OPERATIONS | 2008 |
|
RU2496972C2 |
METHOD FOR CHECKING FRACTURE GEOMETRY FOR MICROSEISMIC EVENTS | 2014 |
|
RU2637255C2 |
PREDICTING PROPERTIES OF UNDERGROUND FORMATION | 2008 |
|
RU2462755C2 |
BOREHOLE PLANNING USING A GEOMECHANICAL SHIFT | 2020 |
|
RU2779040C1 |
METHOD OF FORMATION BREAKDOWN SIMULATION AND ITS ESTIMATION, AND COMPUTER-READ CARRIER | 2008 |
|
RU2486336C2 |
SIMULATION OF BOTTOM-HOLE ASSEMBLY/DRILLING STRING TRANSIENT MODE DURING DRILLING | 2008 |
|
RU2461707C2 |
Authors
Dates
2015-08-20—Published
2011-12-28—Filed