FIELD: machine building.
SUBSTANCE: present invention provides a method for providing a reverse current (RC) through a power unit blower, which includes the following steps: initiating RC through a blower in the event of failure of the blower of an electric generating installation and reducing the load of the generating set to a predetermined design load RC through a blower, corresponding to the permissible capacity of the equipment currently in operation, with the simultaneous creation of a channel for the passage of flue gases by fully opening the rotary blades of the blower fan at the time of shutdown of the blower fan in order to avoid unplanned shutdown of the generating set and to ensure its continuous operation. Present invention also proposes an apparatus for providing an RC through a pressure fan.
EFFECT: due to the development of new RC functions through a pressure fan, unfavorable effects on the operation of the coal power station after the bypass removal of the desulfurization system and overlapping of flue gases in the event of a failure of the blower, thereby ensuring the stable operation of the generating set.
10 cl, 6 dwg, 2 tbl
Title | Year | Author | Number |
---|---|---|---|
ELECTRICITY SUPPLY SETTING, EQUIPPED WITH MEANS OF ENERGY STORAGE, AND CONTROL METHOD OF SUCH FACILITY | 2012 |
|
RU2611725C2 |
LOADING AND VENTILATION MILL MANAGEMENT SYSTEM | 2015 |
|
RU2618346C2 |
EXCESS AIR SYSTEM WITH TUBULAR AIR HEATER | 2005 |
|
RU2313729C2 |
METHOD OF POWER SUPPLY TO ELECTRIC COLLECTORS MAINTAINING CONTINUOUS PRODUCTION PROCESS AT INDUSTRIAL FACILITIES | 2007 |
|
RU2352046C1 |
SYSTEM OF DUST PRODUCTION FOR POWERFUL ENERGY BOILER | 2009 |
|
RU2410602C2 |
COMBINED-CYCLE PLANT | 1995 |
|
RU2106500C1 |
HIGH-TEMPERATURE STEAM POWER PLANT FOR SUBCRITICAL PRESSURE AND HIGH-TEMPERATURE FLOW BOILER FOR SUBCRITICAL PRESSURE OPERATING AT VARIABLE PRESSURE | 2013 |
|
RU2584745C2 |
DRY SORBENT INTRODUCTION UNDER CONDITIONS OF NON-STATIONARY STATE INTO DRY GAS CLEANING SCRUBBER | 2012 |
|
RU2607410C2 |
CONTROL METHOD OF PULVERISED-COAL BOILER PLANT | 2012 |
|
RU2563646C2 |
METHOD OF CONTROLLING BOILER-TURBINE POWER SYSTEM IN EMERGENCY CONDITIONS | 0 |
|