FORMATION METHOD OF VERTICALLY DIRECTED FRACTURE AT HYDRAULIC FRACTURING OF PRODUCTIVE FORMATION Russian patent published in 2014 - IPC E21B43/26 

Abstract RU 2510456 C2

FIELD: oil and gas industry.

SUBSTANCE: two side horizontal shafts are drilled in a productive formation parallel to each other and arranged in one vertical plane. After perforation is completed, a well strainer is installed in the upper horizontal shaft and a perforated liner is installed in the lower one. Then, oilwell tubing with a packer is lowered to the main shaft of the well, and the above packer is installed between upper and lower horizontal shafts. Before hydraulic fracturing of the productive formation is performed, annular space of the well is equipped on the head with an adjustable throttle and sealed. Moment of fracture formation between upper and lower horizontal shafts is determined as per stepwise rise of pressure in the annular space of the well. After the fracture is formed, pressure in the annular space of the well is reduced by means of the adjustable throttle. Further pumping of carrying liquid with a propping agent and displacement fluid is performed at counter pressure created on the head. After the displacement fluid is pumped, the following is performed in series: unloading of the well, removal of the packer and flushing of the main shaft of the well. Size of cells of the well strainer shall be less than average diametre of particles of the propping agent used at hydraulic fracturing of the productive formation.

EFFECT: improving effectiveness of the hydraulic fracturing process of the productive formation and creating the conditions allowing to reduce carryover intensity of solid mechanical impurities from the productive formation to the well shaft.

6 cl, 1 dwg

Similar patents RU2510456C2

Title Year Author Number
METHOD OF INTERVAL MULTISTAGE HYDRAULIC FRACTURING OF FORMATION IN OIL AND GAS WELLS 2016
  • Gimaev Artur Faatovich
  • Erenyakov Oleg Fedorovich
RU2634134C1
METHOD OF HYDRAULIC FRACTURING OF WELL FORMATION 2011
  • Makhmutov Il'Gizar Khasimovich
  • Zijatdinov Radik Zjauzjatovich
  • Salimov Oleg Vjacheslavovich
  • Salimov Vjacheslav Gajnanovich
  • Zhirkeev Aleksandr Sergeevich
RU2483209C1
INTERVAL HYDRAULIC FRACTURING OF CARBONATE FORMATION IN HORIZONTAL WELLBORE WITH BOTTOM WATER 2014
  • Makhmutov Il'Gizar Khasimovich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
  • Girfanov Il'Dar Il'Jasovich
  • Mansurov Ajdar Ul'Fatovich
RU2558058C1
MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN WELL HORIZONTAL SHAFT 2014
  • Makhmutov Il'Gizar Khasimovich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
  • Salimov Vjacheslav Gajnanovich
RU2547892C1
METHOD FOR MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL BOREHOLE OF WELL 2019
  • Khusainov Ruslan Fargatovich
  • Ismagilov Fanzat Zavdatovich
  • Tabashnikov Roman Alekseevich
RU2708747C1
METHOD FOR MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL SHAFT OF WELL 2017
  • Nasybullin Arslan Valerevich
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
RU2667240C1
MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN WELL HORIZONTAL SHAFT 2013
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
  • Sulejmanov Farid Bashirovich
  • Salimov Vjacheslav Gajnanovich
  • Zhirkeev Aleksandr Sergeevich
RU2526062C1
METHOD FOR MULTIPLE FORMATION HYDRAULIC FRACTURING IN HORIZONTAL WELL SHAFT 2013
  • Ismagilov Fanzat Zavdatovich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
  • Sulejmanov Farid Bashirovich
  • Salimov Vjacheslav Gajnanovich
RU2539469C1
METHOD FOR MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL SHAFT OF WELL 2017
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
  • Mansurov Ajdar Ulfatovich
RU2655309C1
METHOD FOR HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL SHAFT OF WELL 2016
RU2613403C1

RU 2 510 456 C2

Authors

Makeeva Natal'Ja Ivanovna

Dates

2014-03-27Published

2011-05-20Filed