FIELD: construction.
SUBSTANCE: invention relates to the construction and reconstruction of railways for high-speed rail transport. High-speed main road bed contains the embankment body on which the layer of asphalt concrete is laid. Umbankment body contains two protective layers. One protective layer consists of a crushed stone-sand mixture with a deformation module of at least 80 MPa, and the second protective layer consists of a crushed stone-gravel-sand mixture with a deformation module of 120 MPa. Thickness of the first protective layer is 5.25–5.75 times greater than the thickness of the second protective layer.
EFFECT: increase in the reliability and durability of the operation of the ballastless upper track structure is achieved.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
HIGH SPEED MAIN ROAD | 2017 |
|
RU2668529C1 |
RING HIGHWAY OF MEGAPOLICE AND METHOD FOR RECONSTRUCTION OF MEGAPOLICE RING HIGHWAY | 1998 |
|
RU2135672C1 |
MOTOR ROAD AND METHOD OF ITS OPERATION TOGETHER WITH REPAIR AND RECONSTRUCTION | 1998 |
|
RU2135671C1 |
BALLAST-FREE RAILWAY TRACK FOR CARGO AND PASSENGER HIGH-SPEED TRAFFIC AND METHOD FOR CONSTRUCTION THEREOF | 2020 |
|
RU2755804C1 |
DEVICE FOR NON-SEDIMENTARY EMBANKMENTS OF HIGH-SPEED NETWORK | 2018 |
|
RU2681722C1 |
MEGAPOLICE RING HIGHWAY AND METHOD FOR ITS RECONSTRUCTION | 1998 |
|
RU2136802C1 |
REMOTE CONTROL DEVICE FOR BALLASTLESS TRACKS STATE | 2015 |
|
RU2613126C1 |
ROAD STRUCTURE | 2012 |
|
RU2516603C1 |
METHOD OF STRENGTHENING ROAD BED OF AUTOMOBILE ROADS IN PLACES OF CULVERTS | 2018 |
|
RU2674783C1 |
SYSTEM FOR LAYING CABLE COMMUNICATIONS ON THE RUN FOR A BALLAST-FREE RAILWAY TRACK | 2018 |
|
RU2684159C1 |
Authors
Dates
2018-10-01—Published
2017-12-28—Filed