FIELD: construction.
SUBSTANCE: invention relates to the field of construction and can be used in the construction of pipe-concrete columns of frame buildings. Pipe-concrete column assembly consists of separate elements connected at the welding. Tubular elements of the barrel of the round column are made of cylindrical shell tubes and a concrete core reinforced with a space frame, which in turn is welded to the plates of consoles located in vertical slots of the shells. Concreting of the core using non-shrinkage cement is carried out by a concrete pump from below through an inlet in a shell provided with a concrete gate preventing the flow of the mixture.
EFFECT: technical result consists in increased capacity of the column stem and improved quality of the concreting and reliable inclusion in the joint work with the shell of the reinforced concrete core, and in addition, the labour costs for concreting are reduced.
1 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
MORTAR GATE FOR PIPE CONCRETE COLUMNS | 2022 |
|
RU2792875C1 |
PIPE CONCRETE PILE WITH REINFORCED BASE AND METHOD OF ITS ERECTION | 2011 |
|
RU2492294C1 |
BUILDING FRAME | 2022 |
|
RU2793496C1 |
METHOD TO MANUFACTURE REINFORCED CONCRETE FRAME OF RESIDENTIAL, PUBLIC, INDUSTRIAL BUILDINGS, GARAGES AND PARKING LOTS | 2011 |
|
RU2473747C2 |
METHOD OF CONSTRUCTING A CONICAL HEAD FOR TUBULAR CONCRETE COLUMNS WITH CIRCULAR CROSS-SECTION | 2020 |
|
RU2747999C1 |
FOUNDATION FOR METAL COLUMN, METHOD OF FOUNDATION CONSTRUCTION AND ALIGNMENT | 1995 |
|
RU2123091C1 |
AUTOMATED METHOD TO ERECT STRUCTURE FRAME | 2011 |
|
RU2495987C2 |
PRE-STRESSED TUBULAR-CONCRETE MEMBER WITH FAN REINFORCEMENT | 1999 |
|
RU2167985C1 |
METHOD TO BUILD-UP PIPE-CONCRETE COLUMNS AND TO JOIN THEM WITH SLABS | 2012 |
|
RU2503782C2 |
METHOD OF STIFF CONNECTION OF TUBULAR CROSSBAR OVAL IN SECTION WITH GUNCRETE CARCASS PILLAR OVAL IN SECTION | 2011 |
|
RU2472905C2 |
Authors
Dates
2018-10-09—Published
2017-01-23—Filed