METHOD TO MANUFACTURE REINFORCED CONCRETE FRAME OF RESIDENTIAL, PUBLIC, INDUSTRIAL BUILDINGS, GARAGES AND PARKING LOTS Russian patent published in 2013 - IPC E04B1/22 

Abstract RU 2473747 C2

FIELD: construction.

SUBSTANCE: method includes erection of pillars, manufacturing of slabs with two hidden crossbars with biaxial pre-stressing along the vertical line, tightening of stressed reinforcement elements. Stressed reinforcing elements are arranged in the form of ropes with a shell with lubrication. Stressed reinforcing elements are tightened in two rows along the height in turns through one. Upper row ropes are tightened along the epure of moments. Pillars of adjacent floors from tube confined concrete are joined with the help of an adapter in the form of a pipe with four consoles for installation of stressed reinforcement onto them. In consoles there are holes provided for bar reinforcement. Between hidden crossbars in the span and along axes the slab is made as ribbed with the help of moulds for puncheons. Ropes in the shell are tightened after slab pouring with concrete and its maintenance to the required strength.

EFFECT: higher reliability of building resistance to vertical seismic loads, increased frame span, reduced labour intensiveness, cost and process cycle of erection.

2 dwg

Similar patents RU2473747C2

Title Year Author Number
METHOD TO MANUFACTURE SLABS IN WOODEN LOW-RISE BUILDINGS 2011
  • Martynov Aleksandr Aleksandrovich
  • Lobov Oleg Ivanovich
RU2478763C1
METHOD TO MANUFACTURE BUILDINGS AND STRUCTURES WITH LAYOUT TRANSFORMED IN PROCESS OF OPERATION 2011
  • Martynov Aleksandr Aleksandrovich
  • Lobov Oleg Ivanovich
RU2488667C2
METHOD FOR HIGH-RELIABILITY PRE-STRESSED REINFORCED CONCRETE BUILDING SKELETON PRODUCTION 2007
  • Martynov Aleksandr Aleksandrovich
RU2323305C1
METHOD FOR TENSIONING OF HIGH-STRENGTH REINFORCING STEEL IN MANUFACTURE OF FLOORS OF PRECAST-MONOLITHIC BUILDINGS WITH FRAME WITHOUT CROSS-BARS 1999
  • Martynov A.A.
RU2182627C2
PROCESS OF TENSION OF CABLE REINFORCEMENT WHILE MANUFACTURING PREFABRICATED-MONOLITHIC FLOORS OF BUILDINGS WITH SPANNER-FREE FRAME 2001
  • Martynov A.A.
RU2199632C1
METHOD OF TENSIONING HIGH-STRENGTH SCREW REINFORCEMENT IN PRODUCTION OF PRESTRESSED FLOORS OF PREFABRICATED-MONOLITHIC BUILDINGS WITH JOINTLESS FRAME 2019
  • Martynov Aleksandr Aleksandrovich
RU2733624C1
METHOD FOR REINFORCEMENT ROPE TIGHTENING DURING BUILDING ERECTION IN ACCORDANCE WITH INDUSTRIAL ERECTION SYSTEM 2002
  • Martynov A.A.
RU2264506C2
METHOD TO MANUFACTURE PRESTRESSED PREFABRICATED REINFORCED CONCRETE SOLID SURFACES OF ROADS AND AIRFIELD STRIPS 2011
  • Martynov Aleksandr Aleksandrovich
  • Lobov Oleg Ivanovich
RU2485240C2
METHOD FOR ERECTING SKELETON OF REINFORCED CONCRETE BUILDINGS 1999
  • Martynov A.A.
RU2176704C2
METHOD OF MULTISTOREY BUILDING CARCASSING 2007
  • Bikbau Marsel' Janovich
  • Bikbau Jan Marsel'Evich
RU2338843C1

RU 2 473 747 C2

Authors

Martynov Aleksandr Aleksandrovich

Lobov Oleg Ivanovich

Dates

2013-01-27Published

2011-02-04Filed