FIELD: data processing.
SUBSTANCE: invention relates to systems for collecting seismic data. To this end, in the collecting method, in the storage device other than the central station, coming from several seismic data acquisition devices, there is provided a step of assigning at least one device as a data collector. For the particular data collector in question, the method also includes the following steps for data, specific for at least one seismic acquisition device not assigned as a data collector: transmitting specific data from at least one seismic data acquisition device to the radio data collector in question, installed in a multi-span radiocommunication network constructed using at least the considered data collector and several seismic data acquisition devices; and transmitting said specific data from the data collector to the storage device via the communication link.
EFFECT: technical result is to enable the field operator to call up and process data from seismic data devices without any connection to the laboratory (control center station).
11 cl, 8 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SYNCHRONIZATION IN THE DATA COLLECTION SYSTEM | 2015 |
|
RU2669012C2 |
METHOD FOR AUTOMATICALLY ASSIGNING WIRELESS SEISMIC ACQUISITION UNITS TO TOPOGRAPHIC POSITIONS | 2015 |
|
RU2684491C2 |
SEISMIC DATA COLLECTION SYSTEM | 2009 |
|
RU2510049C2 |
APPARATUS AND METHOD OF COLLECTING SEISMIC DATA, SEISMIC SURVEY SYSTEM | 2004 |
|
RU2450255C2 |
METHOD OF COLLECTING SEISMIC DATA IN REAL TIME | 2023 |
|
RU2823651C1 |
SYSTEM COLLECTING SEISMIC DATA AND PROCEDURE TO CONDUCT SEISMIC PROSPECTING | 1997 |
|
RU2190241C2 |
SEISMIC DATA COLLECTION SYSTEM | 2021 |
|
RU2777271C1 |
METHOD AND SYSTEM FOR SEISMIC DATA TRANSMISSION | 2004 |
|
RU2333516C2 |
METHOD FOR DOWNLOADING DATA TO CENTRAL UNIT IN SEISMIC DATA ACQUISITION SYSTEM | 2014 |
|
RU2675899C2 |
DATA COLLECTION MODULE AND CABLE CONNECTOR | 2011 |
|
RU2486547C2 |
Authors
Dates
2018-10-11—Published
2015-03-11—Filed