FIELD: construction.
SUBSTANCE: method refers to the bridge construction area and can be used for installing bridge span structures. Mounted span structure is connected at one end to the swinging mast and is located on the overpassed structure, then a swaying mast is installed at the trestle support and pivotally connected to it, on the flyover structure of the trestle a motor vehicle with an attached guide device is attached to which the mounted span structure is attached and the thrust is carried out by moving the tractor forward while lowering the mast before installing the span structure on the support.
EFFECT: expanded functionality of the assembly method, which will reduce the complexity of operations when mounting a span structure in the construction of a metal overhead and thereby achieve a reduction in time and labor.
1 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MOUNTING IMZH-500 RAILROAD BRIDGE WITH COLLAPSIBLE RAILWAY CANTILEVER CRANE FOR INSTALLATION OF SUPPORT AND SPANS IN ONE PROCESS CYCLE | 2020 |
|
RU2740595C1 |
INSTALLATION OF UNDERWATER ROAD DEMOUNTABLE BRIDGE IN DESIGN POSITION OF SUPERSTRUCTURE WITH ONE INTERMEDIATE PILE-SHOE SUPPORT | 2019 |
|
RU2737748C1 |
METHOD OF TRANSPORTATION OF REM-500 EQUIPMENT BY RAIL | 2017 |
|
RU2657636C1 |
METHOD FOR MOUNTING LARGE-SPAN COVERINGS WITH PUSHING FORCE | 2021 |
|
RU2789028C1 |
METHOD OF INSTALLING FLYOVER ON SCREW PILES | 2017 |
|
RU2659287C1 |
METHOD TO ASSEMBLE INVENTORY LOW-WATER BRIDGE ON SCREW PILES BY SPAN LAUNCHING | 2010 |
|
RU2446246C2 |
METHOD AND UNIT FOR CONSTRUCTION OF EXPRESSWAY AND EXPRESSWAY | 2001 |
|
RU2181396C1 |
COLLAPSIBLE CANTILEVER CRANE | 2021 |
|
RU2774693C1 |
MOBILE SPAN OF BRIDGE AND METHOD FOR ITS TRANSPORTATION AND ASSEMBLY | 2012 |
|
RU2509186C2 |
CONSTRUCTION METHOD FOR BRIDGE OR OVERPASS | 2002 |
|
RU2251604C2 |
Authors
Dates
2018-11-26—Published
2017-08-07—Filed