FIELD: ways to monitor.
SUBSTANCE: invention relates to methods for monitoring the state of anti-filtration elements of hydraulic structures, for example, earth dams, using electrometry using resistance methods. Method of monitoring the state of the diaphragm from the boron-cutting alumina-cement concrete piles 2 in earth dam 1 by the method of electro-tomography involves performing vertical electrical sounding at the control points, the construction of the distribution curves of electrical resistivity and their comparison with previously obtained. After the construction of diaphragm 2 in earth dam 1, steel electrodes 4 are installed in increments of at least 1 m, then the electrodes are switched by multicore geophysical cable 8, which is connected to the data collection and processing unit 7, probing is performed using a tomographic observation system with the subsequent construction of a two-dimensional map of the distribution of electrical resistivity and its comparison with the previously obtained one. Supply and receiving electrodes are installed directly into the body of the diaphragm 2 along its axis to a depth of at least 250 mm from the top edge to eliminate the distorting effect of the surface layer of the ground mass above diaphragm 2.
EFFECT: determination of places of concentrated intensive filtration with an accuracy of 1 m, reduction of terms and costs for their detection and elimination.
1 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
GROUND DAM WITH CLAY-CEMENT-CONCRETE DIAPHRAGM | 2019 |
|
RU2736193C2 |
EARTH DAM WITH CLAY-CEMENT-CONCRETE DIAPHRAGM WITH ADJUSTABLE STRESS-STRAIN STATE | 2023 |
|
RU2811440C1 |
METHOD OF MONITORING CONTROL OF THE PHYSICAL STATE OF A GEOLOGICAL ENVIRONMENT | 2015 |
|
RU2650084C2 |
GEOELECTRIC METHOD FOR PREDICTION OF LANDSLIPS ON MANMADE SOIL STRUCTURES | 2008 |
|
RU2383904C2 |
METHOD OF MOUNTING REMOTE CONTROL AND MEASURING EQUIPMENT INTO SECANT PILES OF AN CLAY-CEMENT-CONCRETE DIAPHRAGM OF SOIL DAM | 2023 |
|
RU2822674C1 |
GEOELECTRIC METHOD FOR DETERMINING CAPACITY OF SOIL-PERMAFROST COMPLEX SUITABLE FOR ENGINEERING AND CONSTRUCTION WORKS | 2016 |
|
RU2646952C1 |
METHOD OF ELECTRICAL PROSPECTING IN WATER AREA WITH DIRECT CURRENT FOR DETAILED DISMEMBERMENT OF UPPER PART OF BOTTOM SEDIMENTS SECTION | 2022 |
|
RU2816484C1 |
METHOD FOR ELECTRICAL TOMOGRAPHY OF A CARBONACEOUS SEAM | 2021 |
|
RU2761811C1 |
DEVICE AND METHOD FOR STUDYING POROUS SAMPLES, SYSTEM AND METHOD FOR CONSTRUCTING THE DISTRIBUTION OF THE SPECIFIC ELECTRIC RESISTANCE OF POROUS SAMPLES WITH THEIR USE | 2022 |
|
RU2778498C1 |
0 |
|
SU1784714A1 |
Authors
Dates
2019-01-29—Published
2018-02-06—Filed