FIELD: oil and gas industry.
SUBSTANCE: invention relates to oil industry and can be used to increase efficiency of impact on oil-saturated interval of formation in horizontal section of oil well shaft. Method comprises well killing with salt solution, extraction of downhole equipment, installation of production of shear-blind preventer, riser on production of X-mas equipment, blowout protection unit, sealing device, as well as an injector with a guiding arch, supply to the horizontal section of the well on the flexible tube of equipment, including a connector with a flexible pipe, set of check valves, emergency disconnector, a circulation valve and a device for plasma-pulse action, closing a calibrated metal wire of a plasma-pulse action device by an operator's command over a cable, explosion in the horizontal section of the well, lifting the downhole assembly with a device for plasma-pulse action, well development and outputting to the mode.
EFFECT: technical result consists in increasing production wells and increasing oil recovery of formations.
1 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO ISOLATE CONE OF BOTTOM WATER IN GAS PRODUCING WELL | 2020 |
|
RU2726668C1 |
METHOD AND DEVICE OF IMPACT ON OIL-SATURATED FORMATIONS AND BOTTOMHOLE ZONE OF HORIZONTAL WELL | 2014 |
|
RU2600249C1 |
METHOD FOR CONTROLLING THE LOWER COLUMN FOR DESCENT WITH SECURITY SYSTEM DUPLICATION | 2020 |
|
RU2773838C2 |
METHOD FOR CONTROLLING THE LOWER STRING FOR DESCENT | 2020 |
|
RU2773834C2 |
HYDRAULIC STRING CONTROL SYSTEM FOR LOWERING | 2020 |
|
RU2768811C1 |
HYDROELECTRIC CONTROL SYSTEM OF COLUMN FOR DESCENT WITH BACKUP CONTROL SYSTEM OF SEQUENTIAL ACTIVATION WITH PRESSURE RELIEF INTO CAVITY OF WATER SEPARATION COLUMN | 2020 |
|
RU2763868C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL DEPOSIT | 2017 |
|
RU2669950C1 |
METHOD FOR NEUTRALIZATION OF HYDROCHLORIC ACID RESIDUES AFTER TREATMENT OF BOTTOMHOLE FORMATION ZONE | 2019 |
|
RU2724725C1 |
METHOD OF ABANDONMENT OF OIL-AND-GAS WELL WITH PRODUCTION STRING MULTIPLE UNTIGHT SECTIONS | 2010 |
|
RU2441135C1 |
METHOD OF EXTRACTING BROKEN AND STUCK PIPES STRING OF FLEXIBLE PIPES OF EMERGENCY WELL | 2015 |
|
RU2596158C1 |
Authors
Dates
2019-09-02—Published
2018-12-18—Filed