FIELD: transportation.
SUBSTANCE: rail track includes the combined frame structure consisting of rails, connected to the prestressed monolithic or prefabricated grillage elements, made of reinforced concrete, metal, or of composite material. Connection to the piles is made through the inclined and vertical trapezoidal grooves at the grillage and pile head cross member half the height. Piles horizontal axis coincides with the railway track central axis, as well as with the rails grillages axis along the straight sections and with the axis radial displacement towards the maximum momentary forces action from the train movement in the turning areas. Piles vertical axes inclination angle is made from 90 to 60 degrees from the railway track horizontal plane opposite the train movement direction.
EFFECT: increase in the track reliability.
1 cl, 15 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR INSTALLATION OF PERMANENT WAY | 2007 |
|
RU2352705C1 |
METHOD FOR INSTALLING PALLETS TO PROTECT RAILWAY TRACKS FROM OIL SPILLS AND OTHER CONTAMINANTS AND THE PALLETS AS SUCH | 2020 |
|
RU2759400C1 |
TRACK UPPER STRUCTURE DESIGN | 2007 |
|
RU2352706C1 |
CONSTRUCTION OF PREFABRICATED GROUND FOUNDATION FOR HIGH-SPEED RAIL TRANSPORT OVERPASS | 2023 |
|
RU2814450C1 |
METHOD TO DETERMINE BEARING CAPACITY OF NEEDLE PILE | 2013 |
|
RU2561093C2 |
RAILWAY RAIL LENGTH (VERSIONS) | 2007 |
|
RU2381317C2 |
PRESTRESSED REINFORCED CONCRETE SLAB FOR RAILWAY ROADS | 2007 |
|
RU2373317C2 |
RAILWAY PADDLAY | 2021 |
|
RU2765269C1 |
METHOD TO INCREASE BEARING CAPACITY OF BORED PILE | 2012 |
|
RU2509842C2 |
RAILWAY CROSSING | 2020 |
|
RU2764759C1 |
Authors
Dates
2019-09-12—Published
2017-05-15—Filed