FIELD: construction; foundations on piles.
SUBSTANCE: structure of the ground prefabricated foundation of a high-speed rail transport overpass consists of a reinforced concrete base slab and piles. The reinforced concrete base slab consists of slabs, the side surface of which contains protrusions for connecting the slabs to each other; the base slab contains anchorage for the overpass supports, vertical and inclined holes for piles. Piles installed vertically in the ground are screw piles; in the upper above-ground part they have a nut, a thread and a support ledge for a reinforced concrete base slab; the upper part of all screw piles ends with a multifaceted prism.
EFFECT: increasing the stability of a prefabricated ground foundation to loads from the movement of high-speed rail transport in a wide range of soil strength.
2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
RAILWAY RAIL TRACK | 2017 |
|
RU2700098C2 |
SEPARATE GRADE CROSSING OF MOSCOW RING HIGHWAY AND YAROSLAVSKOYE SHOSSE | 1998 |
|
RU2139384C1 |
TRANSPORT COMPLEX OF MEGALOPOLIS AND METHOD FOR CONTROL AND RELIEF OF PASSENGER, FREIGHT - PASSENGER AND FREIGHT TRAFFICS OF MEGALOPOLIS TRANSPORT COMPLEX | 1998 |
|
RU2140480C1 |
TRANSPORTATION COMPLEX OF MEGAPOLICE AND METHOD FOR REGULATING AND RELIEVING PASSENGER, CARGO-PASSENGER AND CARGO TRAFFIC FLOWS IN IT | 1998 |
|
RU2135670C1 |
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
MEGAPOLICE RING HIGHWAY AND METHOD FOR ITS RECONSTRUCTION | 1998 |
|
RU2136802C1 |
RING HIGHWAY OF MEGAPOLICE AND METHOD FOR ITS RECONSTRUCTION | 1998 |
|
RU2136803C1 |
UNIVERSAL DISMOUNTABLE ICE CUTTER | 2020 |
|
RU2746339C1 |
PILE-PLATE FOUNDATION | 2016 |
|
RU2649352C1 |
METHOD OF CONSTRUCTION PILE FOUNDATION | 0 |
|
SU789649A1 |
Authors
Dates
2024-02-28—Published
2023-06-19—Filed