CONTROL SYSTEM OF DRILLING PROCESS WHILE INSTALLATION OF GROUND SCREWS Russian patent published in 2019 - IPC E02D13/06 G01L3/14 G01L1/22 G01L5/16 

Abstract RU 2702305 C2

FIELD: construction.

SUBSTANCE: invention relates to the field of construction, in particular to the control of drilling process during the installation of ground screws. Proposed control system is applicable for drilling machines with various types of rotary actuators of ground screws. According to the invention, measuring sensors for torque strengths, immersion depth, rotation speed and screw angle of dip are assembled in the body of measuring module located between the hydraulic motor of drilling machine and the screw with the possibility of rotation during the twisting of a screw. Torque sensor is made in the form of a metal shaft of measuring module connected at one end to the hydraulic motor, and the other with – a screw, and includes a strain gauge bridge and an electronic unit. Casing of the electronic unit is located around the shaft of torque sensor and includes a unit for matching a signal of the strain gauge bridge, an inertial sensor for determining the angle of dip and the screw speed of rotation, ultrasonic horn of depth of immersion of a screw, computing unit, radio interface unit and autonomous power supply. Measurement module is connected by Bluetooth Low Energy communication with the operator's terminal, and further – by mobile communication with a data aggregation device in the form of remote server. Remote server is connected to the work supervisor's workstation with the possibility of information exchange with the operator's terminal.

EFFECT: technical result is to increase the accuracy of measured parameters with the transmission of measurement data in real time via wireless communication with the possibility of archiving the drilling parameters and the formation of a full report on the screw field.

1 cl, 5 dwg

Similar patents RU2702305C2

Title Year Author Number
DEVICE FOR MEASURING DRILLING PARAMETERS 2015
  • Boldyrev Gennadij Grigorevich
  • Boldyreva Elena Gennadevna
  • Idrisov Ilya Khamitovich
RU2626865C2
METHOD OF ENGINEERING-GEOLOGICAL SURVEYING 2019
  • Boldyrev Gennadij Grigorevich
  • Boldyreva Elena Gennadevna
  • Idrisov Ilya Khamitovich
RU2706284C1
PLANT FOR SOUND PROCEDURE 2012
  • Boldyrev Gennadij Grigor'Evich
  • Elatontsev Arkadij Ivanovich
  • Idrisov Il'Ja Khamitovich
  • Krasnov German Il'Ich
  • Kushnir Leonid Grigor'Evich
RU2541977C2
DRILLING AND PROBING PARAMETERS MEASURING DEVICE 2019
  • Boldyrev Gennadij Grigorevich
  • Boldyreva Elena Gennadevna
  • Idrisov Ilya Khamitovich
RU2712897C1
AUTOMATED DEVICE, AND METHODS FOR CONTROLLED DIRECTIONAL DRILLING 2008
  • Bun Skott
  • Ehllis Brajan
  • Gillan Kolin
  • Kattel Bit
RU2471980C2
SIMULATION OF BOTTOM-HOLE ASSEMBLY/DRILLING STRING TRANSIENT MODE DURING DRILLING 2008
  • Pejbon Dzheir
  • Uiks Natan
  • Chan Jun
  • Chehpman Klinton
  • Singkh Vivek
RU2461707C2
WELL DRILLING PROCESS AUTOMATED CONTROL SYSTEM 2023
  • Khaerlanamov Rafail Rifovich
RU2808359C1
AUTOMATIC DRILLING MACHINE ON BASE OF (MECHANIC SPECIFIC ENERGY) MSE 2007
  • Bun Skott
  • Ehllis Brajan
  • Kattel Bit
  • Papuras Kris
  • Skarboro Tommi
RU2424430C2
DETERMINATION OF OPTIMUM PARAMETERS FOR DOWNHOLE OPERATIONS 2012
  • Semyuel Robello
  • Zhermen Olive Rozhe
  • Singkh Amit Kumar
  • Marlend Kristofer Nil
  • Adari Ram Naresh
RU2588526C2
SYSTEM AND METHOD FOR AUTOMATIC CALIBRATION OF LOAD AT DRILL BIT TRANSDUCER AND CONTROL OVER DRILL STRING FLEXURE 2012
  • Khehj Richard T.
  • Sehmjuehl' Robello
RU2567575C1

RU 2 702 305 C2

Authors

Merzlyakov Andrej Valerevich

Dates

2019-10-07Published

2018-03-19Filed