FIELD: oil extracting industry. SUBSTANCE: method includes lowering of electrical centrifugal pump and gas separator along tubing pipes. Before lowering packer and tang from tubing pipes with perforated lower part are mounted in the well and fixed on the pit-face or drain pit. It allows creation of needed speed of upward layer fluids stream for exporting water and mechanical admixtures from the pit-face. Packer is unpacked using the weight of electrical centrifugal pump, gas separator and portion of weight of above tubing string of piping. EFFECT: impossible forming of fluidal or argillaceous plug on the pit-face. 1 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR OPERATION OF PRODUCT WELL AND EQUIPMENT FOR REALIZATION OF SAID METHOD | 2004 |
|
RU2291957C2 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL DEPOSIT | 2017 |
|
RU2669950C1 |
METHOD FOR DEVELOPMENT OF SUPERVISCOUS OIL DEPOSIT USING PAIRED HORIZONTAL WELLS | 2023 |
|
RU2813873C1 |
DEVICE FOR DRILLING OF WELL AND ITS OPERATION | 2010 |
|
RU2450112C1 |
METHOD OF BOREHOLE AND WELLHEAD EQUIPMENT LAYOUT FOR WELL SURVEY ENVISAGING INJECTION OF INJECTION FLUID TO FORMATION AND EXTRACTION OF FLUIDS FROM FORMATION | 2013 |
|
RU2531414C1 |
METHOD OF OIL FORMATION DEVELOPMENT | 2016 |
|
RU2622418C1 |
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTI LAYER DEPOSIT AND DEVICE FOR REALIZING SAID METHOD | 2014 |
|
RU2594235C2 |
OIL PRODUCING WELL DEVELOPMENT AND OPERATION METHOD | 2011 |
|
RU2471975C2 |
METHOD TO OPERATE WELL FURNISHED WITH ELECTRIC-CENTRIFUGAL PUMP | 2012 |
|
RU2515646C1 |
METHOD OF CONDUCTING WATER-INSULATING WORKS IN THE EXTRACTING WELL, EXCLUDING THE WATER OIL DEPOSIT | 2017 |
|
RU2661935C1 |
Authors
Dates
2004-03-20—Published
2003-04-04—Filed