FIELD: transportation.
SUBSTANCE: invention relates to linear structures of underground pipelines, namely, to methods of producing watertight isolation of inspection process wells. Proposed method comprises the following steps: production of sealed shell from polymer membrane in production conditions; stage of preparatory works at the platform near the process well on the linear part of the main oil pipeline; stage of tight shell installation on process well; stage of final works.
EFFECT: improving operational reliability of waterproofing restoration and increasing durability of waterproofing due to application of shell from polymer membrane.
9 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR REPAIRING SEWAGE WELLS | 2016 |
|
RU2646915C2 |
HEAT INSULATION BUTT JOINT FOR PIPELINES AND METHOD OF ITS ASSEMBLING | 2002 |
|
RU2235246C2 |
METHOD OF HEAT INSULATION OF WELDED JOINTS OF PREVIOUSLY INSULATED PIPES IN CASE OF UNDER-GROUND PIPELINES | 2014 |
|
RU2575528C2 |
METHOD OF FIREPROOF AND HEAT INSULATION OF WELDED JOINTS OF PREVIOUSLY INSULATED PIPES IN CASE OF ABOVE-GROUND PIPELINES | 2014 |
|
RU2575533C2 |
METHOD OF HEAT INSULATION OF WELDED JOINTS OF PREVIOUSLY INSULATED PIPES IN CASE OF ABOVE-GROUND PIPELINES | 2014 |
|
RU2575522C2 |
METHOD TO APPLY COATING ONTO INNER SURFACE OF INSPECTION WELL | 2011 |
|
RU2460001C1 |
COMPLEX ISOLATION OF PIPELINE WELD JOINT AND METHOD OF ITS PRODUCTION | 2017 |
|
RU2696653C2 |
PROCEDURE FOR ANTI-CORROSION INSULATION OF WELDING JOINT OF PIPELINE AND FACILITY FOR ITS IMPLEMENTATION | 2008 |
|
RU2398155C2 |
METHOD FOR SEALING OF PRE-INSULATED PIPES JOINT USING HEAT-SHRINKABLE SLEEVE | 2015 |
|
RU2610980C1 |
METHOD OF ASSEMBLY OF PIPE HEAT INSULATION ANTI-FIRE INSERTS | 2012 |
|
RU2530949C2 |
Authors
Dates
2019-10-29—Published
2019-05-06—Filed