FIELD: oil and gas industry.
SUBSTANCE: invention relates to oil industry, namely, to construction of oil and gas wells in permafrost conditions. Proposed device comprises production string, cooling device, temperature control and monitoring unit. Cooling facility is made in the form of coil pipes, spiral-like casing installed in casing pipe in cement stone of casing string, connected to cooling unit installed at wellhead. Temperature control sensors are arranged in cement stone in the area of cooling coil tubing coils.
EFFECT: improved well integrity and automation of heat insulation process.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
0 |
|
SU440483A1 | |
METHOD OF WELL HEAT INSULATION IN PERMAFROST ZONE | 1999 |
|
RU2154152C1 |
METHOD OF FASTENING THE WELL WITH LEADER IN THE SECTION OF PERMAFROST WITH HIGH ICE CONTENT | 2017 |
|
RU2662830C1 |
HEAT-INSULATION METHOD FOR WELL DRILLED IN PERMAFROST ROCK | 2004 |
|
RU2281383C1 |
METHOD OF PHYSICAL ABANDONMENT OF WELLS | 2014 |
|
RU2576422C1 |
METHOD FOR HEAT INSULATION OF INJECTION WELL | 1996 |
|
RU2120540C1 |
METHOD FOR THERMAL ISOLATION OF MOUTH ZONE OF PRODUCT WELL IN LONG FROZEN ROCKS | 2003 |
|
RU2247225C1 |
METHOD FOR SEALING ANNULAR SPACES OF WELL CASING STRINGS IN CONDITIONS OF DISTRIBUTION OF LOW-TEMPERATURE ROCKS | 2022 |
|
RU2792859C1 |
METHOD OF BOREHOLE AND WELLHEAD EQUIPMENT LAYOUT FOR WELL SURVEY ENVISAGING INJECTION OF INJECTION FLUID TO FORMATION AND EXTRACTION OF FLUIDS FROM FORMATION | 2013 |
|
RU2531414C1 |
OFFSHORE WELL FOR OIL AND GAS RECOVERY WITH ABOVE-WATER PLACEMENT OF WELLHEAD EQUIPMENT | 2014 |
|
RU2566162C1 |
Authors
Dates
2019-11-11—Published
2017-12-27—Filed