FIELD: oil and gas industry.
SUBSTANCE: invention relates to oil and gas industry and can be used for simultaneous separate production of oil from two producing formations by one well. Well pump unit includes a flow column, a packer for separation of productive formations, a well sucker-rod pump with a hydraulic nozzle for hermetic separation of liquids of the lower and upper formation, pump rod string, bushing with bypass channel and radial hole, which communicates reception of sucker-rod pump with annular space above packer. Electric centrifugal pump with input module and electric motor. Plant is equipped with a heat exchanger placed above, below and immediately in the interval of the upper productive formation. External housing of heat exchanger represents two-stage pipe. Outer diameter of pipe of each step exceeds diameter of tubing. Pipe of larger diameter is located below perforation interval of upper formation, and pipe of smaller diameter is located directly in interval of productive formation influx and above with formation between it and casing string channel for free passage of liquid from upper formation to reception of sucker-rod pump. Inside the heat exchanger there is a cylindrical insert made of material with low heat conductivity and heat capacity.
EFFECT: increased efficiency of upper reservoir operation by means of well bore zone heating by produced liquid from lower reservoir.
1 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
WELL PUMPING UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF TWO FORMATIONS | 2019 |
|
RU2726013C1 |
BOREHOLE PUMP UNIT FOR SIMULTANEOUS OPERATION OF TWO BEDS WITH GAS BYPASS FROM UNDER PARKER SPACE (VERSIONS) | 2011 |
|
RU2464413C1 |
PUMP DEVICE FOR SIMULTANEOUS SEPARATE OPERATION OF TWO BEDS IN A WELL | 2005 |
|
RU2291953C1 |
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTIPLE-ZONE WELL BY TWO SUBMERSIBLE PUMPS AND EQUIPMENT FOR ITS IMPLEMENTATION | 2012 |
|
RU2515630C1 |
METHOD OF SIMULTANEOUS SEPARATE OR SUCCESSIVE PRODUCTION OF RESERVOIR FLUID FROM WELL OF MULTIPAY FIELDS WITH PRELIMINARY INSTALLATION OF PACKERS | 2014 |
|
RU2552555C1 |
OIL WELL PUMPING UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF TWO RESERVOIRS | 2009 |
|
RU2405925C1 |
DUAL STRING PRODUCTION METHOD IN WELL WITH INCREASED GAS RATIO AND DEVICE FOR ITS IMPLEMENTATION | 2012 |
|
RU2513566C2 |
PUMP UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF TWO FORMATIONS | 2019 |
|
RU2722174C1 |
METHOD OF DETERMINING AIR-TIGHTNESS OF DOWNHOLE EQUIPMENT WITH DUAL EXTRACTION OF FLUIDS FROM WELL WITH SUCKER-ROD AND ELECTRIC-CENTRIFUGAL PUMP | 2015 |
|
RU2589016C1 |
UNIT FOR DUAL OPERATION OF WELLS | 2014 |
|
RU2569526C1 |
Authors
Dates
2020-02-04—Published
2019-03-22—Filed