METHOD OF CORK DESTRUCTION IN WELL Russian patent published in 2020 - IPC E21B37/00 

Abstract RU 2720038 C1

FIELD: oil and gas industry.

SUBSTANCE: invention relates to oil and gas industry, namely, to plugs destruction during repair of oil and injection wells. Proposed method comprises lowering of tubing string to tubing string to roof of sand plug, injection of flushing fluid to the well, destruction and flushing out of sand plug, removal of flushing pipe string from well. Before lowering, the flushing pipe string is equipped from below with a destructive tool made with possibility of rotation and destruction of the plug. Wellhead is used to communicate with annular space between the tubing string and the flushing pipe string for injecting flushing fluid during back flushing of the well or its spill in washing the plug substance during direct flushing. Cross-sectional area of the flushing pipe column at back flushing and / or annular space during back flushing is selected proceeding from the rate of upward flow of flushing liquid, which must be higher than the rate of sedimentation of the substance of which the plug consists. For direct flushing dimensions of annular space are selected not less than critical for deposition on walls of substance, of which plug consists. Direct and back flushing of the well can alternate depending on efficiency of plug substance washing-out.

EFFECT: enlarging functional capabilities due to cleaning of the well from the plug with large thickness and / or pressed, excluding the possibility of contamination with the flushing fluid washed out space between the production string and the flushing pipe string, increased efficiency of well cleaning, if necessary, by reverse movement of flushing fluid.

3 cl

Similar patents RU2720038C1

Title Year Author Number
METHOD FOR REMOVING SAND-CLAY PLUG IN WELL AND ITS DEVELOPMENT UNDER CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES 2013
  • Grab Aleksej Nikolaevich
  • Bodnarchuk Aleksej Vladimirovich
  • Mashkov Viktor Alekseevich
  • Denjak Konstantin Nikolaevich
  • Velichkin Andrej Vladimirovich
RU2544944C2
METHOD OF DIB HOLE PREPARATION FOR HYDRAULIC FRACTURING 2016
  • Ksenofontov Denis Valentinovich
  • Novikov Igor Mikhajlovich
  • Tabashnikov Roman Alekseevich
  • Minapov Ravil Ramilevich
  • Sabanov Aleksej Vasilevich
  • Adylgareev Irek Nagimovich
RU2622961C1
METHOD FOR OPERATING WELL EQUIPPED WITH ELECTRIC SUBMERSIBLE PUMP UNDER CONDITIONS COMPLICATED BY FORMATION OF ASPHALTENE-RESIN-PARAFFIN DEPOSITS, AND DEVICE FOR ITS IMPLEMENTATION 2023
  • Nasibulin Ruslan Rifovich
  • Pishchaeva Alsu Almazovna
RU2800177C1
METHOD FOR FLUSHING CLAY-SAND OR PROPPANT PLUG OUT OF A WELL 2022
  • Omelianiuk Maksim Vitalevich
  • Pakhlian Irina Albertovna
RU2796409C1
METHOD FOR CLEANING A WELL FROM A COMPACTED SAND PLUG 2021
  • Ismagilov Fanzat Zavdatovich
  • Novikov Igor Mikhailovich
  • Ziiatdinov Radik Ziauziatovich
RU2756220C1
METHOD FOR SAND PLUG EFFLUENT WASHING FROM WELL 2020
  • Ziiatdinov Radik Ziauziatovich
RU2739802C1
METHOD OF CLEANING BOTTOM-HOLE FORMATION ZONE OF INJECTION WELLS AFTER HYDRAULIC FRACTURING 2015
  • Nasybullin Arslan Valerevich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
RU2601879C1
METHOD FOR OPERATING WELL EQUIPPED WITH ELECTRIC SUBMERSIBLE PUMP UNDER CONDITIONS COMPLICATED BY FORMATION OF ASPHALTENE-RESIN-PARAFFIN DEPOSITS, AND DEVICE FOR ITS IMPLEMENTATION 2023
  • Nasibulin Ruslan Rifovich
  • Pishchaeva Alsu Almazovna
RU2801012C1
METHOD OF RECOVERY OF BOTTOM-HOLE FORMATION ZONE OF GAS WELL 2000
  • Tagirov K.M.
  • Dubenko V.E.
  • Andrianov N.I.
  • Zinov'Ev V.V.
RU2183724C2
METHOD FOR PRESSURE TEST OF TUBING STRING 2011
  • Ibragimov Nail' Gabdulbarievich
  • Gabdrakhmanov Rinat Anvarovich
  • Ljubetskij Sergej Vladimirovich
  • Sterljadev Jurij Rafailovich
  • Zotov Aleksandr Maksimovich
  • Shajdullin Timur Faritovich
RU2455479C1

RU 2 720 038 C1

Authors

Abakumov Anton Vladimirovich

Osipov Roman Mikhajlovich

Malkovskij Maksim Aleksandrovich

Dates

2020-04-23Published

2019-07-30Filed