METHOD OF SWABBING WELLS WITH LOW FORMATION PRESSURE AND DEVICE FOR ITS IMPLEMENTATION Russian patent published in 2020 - IPC E21B43/18 

Abstract RU 2720726 C1

FIELD: oil and gas industry.

SUBSTANCE: group of inventions relates to oil and gas industry and can be used in development of wells after drilling and during operation. Proposed method comprises running in well of tubing string with filter and valve. Valve is installed below the swab operating interval, but above the filter. Packers on anchors are installed above productive bed. Fluid from the well is removed through said pipe string. Formation is analyzed on smoothly ascending fluid flow with determination of critical bottomhole pressure, at which formation ceases to work. Products are selected taking into account the studies. Packer is equipped with a fixing assembly and installed before the tubing string is lowered. Tubing string is equipped with nipple above the filter. It is made with possibility of interaction with the fixing unit after lowering into the well. Internal diameter of tubing string in interval of operation of swab, its speed and height of lifting is selected so that bottom-hole pressure is not equal to critical bottom-hole pressure.

EFFECT: broader functional capabilities of inventions owing to possibility of use in wells with low formation pressure.

2 cl, 1 dwg

Similar patents RU2720726C1

Title Year Author Number
DEVICE FOR DEVELOPMENT OF WELL WITH SWABBING 2010
  • Makhmutov Il'Gizar Khasimovich
  • Zijatdinov Radik Zjauzjatovich
  • Asadullin Marat Fagimovich
RU2432457C1
SWABBING METHOD WITH WELL MONITORING 2008
  • Pasechnik Mikhail Petrovich
  • Kovalev Valerij Ivanovich
  • Borisov Jurij Sergeevich
  • Belous Viktor Borisovich
  • Molchanov Evgenij Petrovich
  • Korjakov Anatolij Stepanovich
RU2388909C1
METHOD OF WELL DEVELOPMENT 2012
  • Ibragimov Nail' Gabdulbarievich
  • Taziev Mirgazijan Zakievich
  • Rakhmanov Ajrat Rafkatovich
  • Asljamov Ajrat Ingelevich
RU2480580C1
WELL DEVELOPMENT METHOD AFTER TREATMENT OF BOTTOMHOLE FORMATION ZONE 2018
  • Fatkhullin Salavat Tagirovich
  • Bortnikov Andrej Vitalevich
  • Bikchurin Ramil Faritovich
  • Frolov Denis Vladimirovich
RU2698354C1
DEVICE FOR DEVELOPMENT OF WELL WITH SWABBING 2010
  • Makhmutov Il'Gizar Khasimovich
  • Zijatdinov Radik Zjauzjatovich
  • Asadullin Marat Fagimovich
  • Salimov Oleg Vjacheslavovich
  • Osnos Vladimir Borisovich
RU2432456C1
DEVICE FOR CLEANING, DEVELOPMENT AND INVESTIGATION OF WELL 1996
  • Meshkov A.V.
  • Shlein G.A.
  • Jumachikov R.S.
  • Kuramshin R.M.
  • Demenko A.A.
RU2101470C1
DEVELOPMENT METHOD OF OIL WELLS (VERSIONS), AND PLANT FOR ITS IMPLEMENTATION (VERSIONS) 2010
  • Vakhrushev Andrej Anatol'Evich
  • Khajnovskij Jurij Nikolaevich
  • Vasilenko Petr Vladimirovich
  • Tatarintsev Andrej Anatol'Evich
RU2471065C2
WELL FORMATION DEVELOPMENT DEVICE 2013
  • Fajzullin Ilfat Nagimovich
  • Gazizov Il'Gam Garifzjanovich
  • Ramazanov Rashit Gaznavievich
  • Gubaev Rim Salikhovich
  • Sadykov Rustem Il'Darovich
RU2543246C1
PROCEDURE FOR DEVELOPMENT OF RESERVOIR OF WELL BY SWABBING AND DEVICE FOR ITS IMPLEMENTATION 2010
  • Makhmutov Il'Gizar Khasimovich
  • Zijatdinov Radik Zjauzjatovich
  • Gabdullin Rafagat Gabdelvalievich
  • Asadullin Marat Fagimovich
  • Osnos Vladimir Borisovich
RU2436944C1
METHOD FOR CLEANING THE BOTTOMHOLE FORMATION ZONE OF A WELL 2021
  • Galimov Rustem Irekovich
  • Surkov Nikolai Aleksandrovich
RU2775368C1

RU 2 720 726 C1

Authors

Nikerin Aleksei Gennadevich

Faritov Almaz Zavdatovich

Dates

2020-05-13Published

2019-11-22Filed