FIELD: oil and gas production industry. SUBSTANCE: device has pump-compression pipes with filter and packer with piston plugs located in them. Pipes have perforation openings located at boundary between upper and lower piston plugs. Located on pump-compression pipes in zone of perforation openings is coaxial chamber. Arranged above packer is flushing passage, and installed under filter is deep well pressure gauge. EFFECT: high efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR COMPLETION OF OIL AND GAS WELLS BY SWABBING AND DEVICE FOR ITS EMBODIMENT | 1996 |
|
RU2121565C1 |
DEVICE FOR STIMULATION AND CLEANING OF BOTTOMHOLE FORMATION ZONE | 2001 |
|
RU2213859C2 |
METHOD OF WELL SWABBING | 2000 |
|
RU2181830C1 |
RESERVOIR CLEANING AND COMPLETION DEVICE | 2014 |
|
RU2568615C1 |
WELL DEVELOPMENT METHOD AFTER TREATMENT OF BOTTOMHOLE FORMATION ZONE | 2018 |
|
RU2698354C1 |
METHOD OF SIMULTANEOUS-SEPARATE AND ALTERNATIVE OPERATION AND DEVELOPMENT OF SEVERAL FORMATIONS WITH ONE WELL | 2007 |
|
RU2350742C1 |
DEVICE FOR CLEANING AND DEVELOPMENT OF FORMATION | 2015 |
|
RU2604246C1 |
METHOD OF CHEMICAL REAGENT IMPULSIVE IMPLOSION BOTTOM HOLE TREATMENT, EQUIPMENT FOR ITS EXECUTION, PRESSURE IMPULSE GENERATOR | 2007 |
|
RU2376455C2 |
METHOD OF SWABBING WELLS WITH LOW FORMATION PRESSURE AND DEVICE FOR ITS IMPLEMENTATION | 2019 |
|
RU2720726C1 |
JET-TYPE HYDRAULIC MANIPULATOR | 1996 |
|
RU2105146C1 |
Authors
Dates
1998-01-10—Published
1996-01-04—Filed