FIELD: lifting devices.
SUBSTANCE: in method of elevator installation (1) in elevator shaft of building (3) at least one lifting process is performed. During this lifting process, at least one drive platform (14) carrying driving motor (15), as well as by means of flexible traction ropes (19, 19') cabin (18) of elevator and counterweight (28), is lifted along at least one cabin guide (41), and before lifting, at least one guide (41) of the cabin is elongated above drive platform (14) in the upward direction and in the zone of this elongation is fixed on wall (12) of shaft (2) by, at least one auxiliary beam, and after lifting process, underlying at least one auxiliary beam located under drive platform (14) is replaced with permanent holder (35.5) of guide made different from it.
EFFECT: invention provides adaptation of usable lifting height of elevator to increasing building height.
13 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
ELEVATOR SHAFT CARCASS | 2009 |
|
RU2482051C2 |
ELEVATOR SYSTEM TRACTION DEVICE | 2009 |
|
RU2486125C2 |
ELEVATOR STRUCTURE AND METHOD OF ELEVATOR MANUFACTURING | 2010 |
|
RU2538742C2 |
PROP FOR ELEVATOR SHAFT CARCASS (VERSIONS) | 2009 |
|
RU2506219C2 |
METHOD FOR INSTALLATION OF ELEVATOR EQUIPMENT | 2020 |
|
RU2753020C1 |
ELEVATOR INSTALLING METHOD | 2013 |
|
RU2644074C2 |
METHOD FOR MANUFACTURING ELEVATOR ASSEMBLY | 2020 |
|
RU2747091C1 |
COMPENSATION METHOD OF LOAD UNBALANCE OF ELEVATOR INSTALLATION, AND ELEVATOR INSTALLATION | 2004 |
|
RU2356824C2 |
LIFT | 0 |
|
SU1792401A3 |
ELEVATOR INSTALLATION | 2004 |
|
RU2474527C2 |
Authors
Dates
2020-05-19—Published
2016-12-13—Filed