INSTALLATION FOR SIMULTANEOUS SEPARATE EXTRACTION AND INJECTION Russian patent published in 2020 - IPC E21B43/14 

Abstract RU 2724712 C1

FIELD: oil and gas industry.

SUBSTANCE: invention relates to oil and gas industry and is intended for use on well with simultaneous separate operation, where water is pumped to lower formation to maintain formation pressure, and production is performed on upper formation. Installation for simultaneous separate extraction and pumping through one well comprises drive connected to screw pump shaft, two tubing strings of different length, one of which is a positive, and second is producing with screw pump, parallel two-channel armature, wellhead fittings and packer for separation of formations. Drive used is impeller-type hydraulic drive installed in tubing string injection tubing with possibility of transfer of rotation from its output shaft to shaft of screw pump of inverted type through motor-reducer with parallel shafts, installed above parallel two-channel anchor with possibility of liquid passage through tubing string.

EFFECT: technical result consists in simplification of installation, expansion of technological capabilities due to use of water energy to maintain formation pressure as energy for lifting production of oil-bearing reservoir, low power consumption.

1 cl, 2 dwg

Similar patents RU2724712C1

Title Year Author Number
LANDING FOR DUAL PRODUCTION AND INJECTION 2015
  • Politov Mikhail Anatolevich
  • Panachev Mikhail Vasilevich
  • Orlov Andrej Yurevich
  • Bondar Aleksej Fedorovich
RU2598948C1
UNIT FOR SIMULTANEOUS SEPARATE PRODUCTION AND INJECTION UNDER CONDITIONS COMPLICATED BY HIGH VISCOSITY OF PRODUCT OF UPPER FORMATION 2023
  • Belov Aleksandr Evgenevich
RU2819182C1
METHOD OF INJECTION OF WATER IN THE SYSTEM OF SUPPORTING THE RESERVOIR PRESSURE IN WEAKLY PERMEABLE HEADERS 2018
  • Yusupov Yuris Kavsarovich
  • Nonyava Sergej Aleksandrovich
  • Penzin Aleksej Vyacheslavovich
  • Galikhanov Nil Kamilovich
RU2676780C1
DEVICE FOR DUAL INJECTION OPERATION TO TWO FORMATIONS OF SAME WELL (VERSIONS) 2013
  • Nikolaev Oleg Sergeevich
RU2517294C1
INJECTION WELL 2015
  • Nikolaev Oleg Sergeevich
RU2574641C2
INSTALLATION FOR PUMPING FLUID INTO THE FORMATION 2015
  • Takhautdinov Shafagat Fakhrazovich
  • Abramov Mikhail Alekseevich
  • Stepanov Valerij Fedorovich
  • Fattakhov Rustem Barievich
  • Arsentev Andrej Aleksandrovich
RU2608096C1
METHOD AND DEVICE FOR FORMATION GEOMECHANICAL IMPACT 2018
  • Zakirov Sumbat Nabievich
  • Zakirov Ernest Sumbatovich
  • Indrupskij Ilya Mikhajlovich
  • Anikeev Daniil Pavlovich
  • Baganova Marina Nikolaevna
  • Drozdov Aleksandr Nikolaevich
  • Drozdov Nikolaj Aleksandrovich
RU2680563C1
PROGRAM-CONTROLLED INJECTION WELL 2015
  • Nikolaev Oleg Sergeevich
RU2578078C2
UNIT FOR DUAL BED OPERATION IN WELL 2012
  • Mamakov Anatolij Vasil'Evich
  • Davletov Il'Giz Jasavievich
  • Tukhvatullin Ruslan Musovich
RU2517304C2
PLANT FOR SIMULTANEOUS-SEPARATE PUMPING OF WORKING AGENT 2012
  • Ibragimov Nail' Gabdulbarievich
  • Rakhmanov Ajrat Rafkatovich
  • Ozheredov Evgenij Vital'Evich
  • Zakiev Bulat Flusovich
  • Malikov Marat Mazitovich
RU2475631C1

RU 2 724 712 C1

Authors

Ivanov Vladimir Aleksandrovich

Chernyshov Konstantin Igorevich

Dates

2020-06-25Published

2019-11-29Filed