FIELD: oil and gas industry.
SUBSTANCE: invention relates to oil and gas industry and is intended for use on well with simultaneous separate operation, where water is pumped to lower formation to maintain formation pressure, and production is performed on upper formation. Installation for simultaneous separate extraction and pumping through one well comprises drive connected to screw pump shaft, two tubing strings of different length, one of which is a positive, and second is producing with screw pump, parallel two-channel armature, wellhead fittings and packer for separation of formations. Drive used is impeller-type hydraulic drive installed in tubing string injection tubing with possibility of transfer of rotation from its output shaft to shaft of screw pump of inverted type through motor-reducer with parallel shafts, installed above parallel two-channel anchor with possibility of liquid passage through tubing string.
EFFECT: technical result consists in simplification of installation, expansion of technological capabilities due to use of water energy to maintain formation pressure as energy for lifting production of oil-bearing reservoir, low power consumption.
1 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
LANDING FOR DUAL PRODUCTION AND INJECTION | 2015 |
|
RU2598948C1 |
UNIT FOR SIMULTANEOUS SEPARATE PRODUCTION AND INJECTION UNDER CONDITIONS COMPLICATED BY HIGH VISCOSITY OF PRODUCT OF UPPER FORMATION | 2023 |
|
RU2819182C1 |
METHOD OF INJECTION OF WATER IN THE SYSTEM OF SUPPORTING THE RESERVOIR PRESSURE IN WEAKLY PERMEABLE HEADERS | 2018 |
|
RU2676780C1 |
DEVICE FOR DUAL INJECTION OPERATION TO TWO FORMATIONS OF SAME WELL (VERSIONS) | 2013 |
|
RU2517294C1 |
INJECTION WELL | 2015 |
|
RU2574641C2 |
INSTALLATION FOR PUMPING FLUID INTO THE FORMATION | 2015 |
|
RU2608096C1 |
METHOD AND DEVICE FOR FORMATION GEOMECHANICAL IMPACT | 2018 |
|
RU2680563C1 |
PROGRAM-CONTROLLED INJECTION WELL | 2015 |
|
RU2578078C2 |
UNIT FOR DUAL BED OPERATION IN WELL | 2012 |
|
RU2517304C2 |
PLANT FOR SIMULTANEOUS-SEPARATE PUMPING OF WORKING AGENT | 2012 |
|
RU2475631C1 |
Authors
Dates
2020-06-25—Published
2019-11-29—Filed