UNIT FOR DUAL BED OPERATION IN WELL Russian patent published in 2014 - IPC E21B43/14 

Abstract RU 2517304 C2

FIELD: oil and gas industry.

SUBSTANCE: invention is related to the dual bed operation in one well. The unit contains a packer, a long and a short flow string, two sucker-rod pumps, wellhead equipment and a ground-surface drive for pumps. The unit is equipped with a landing device of a separate type, a centraliser, a guide bushing, a conical plug, a packing V-ring. The body of a ball seal valve is made as a pipe with the inner bore and protrusion and includes a polished rod with torsions to connect rotors of the lower and upper sucker-rod pumps and a thrust bushing, a support ring, packing seals, a compression ring and a press bushing connected to the rod in series. The unit contains an automatic hitch mechanism which includes a protector, a sucker-rod hitch unit, a splined anchor and an adaptor. The unit contains a hydraulic discharger for product discharge. Screw-type pumps are used as sucker-rod pumps. The stator length is reduced per 500-750mm; the stator has a thread at the input side of the screw-type sucker-rod pump.

EFFECT: improving operational efficiency of the unit and reducing material costs.

3 cl, 17 dwg

Similar patents RU2517304C2

Title Year Author Number
INSTALLATION FOR SIMULTANEOUS SEPARATE EXTRACTION AND INJECTION 2019
  • Ivanov Vladimir Aleksandrovich
  • Chernyshov Konstantin Igorevich
RU2724712C1
SELF-ADJUSTING CASING-HEAD STUFFING BOX 1998
  • Volokh O.A.
RU2149977C1
METHOD FOR SEALING THE WELLHEAD OPERATED BY THE INSTALLATION OF A DOWNHOLE SUCKER ROD PUMP WITH PRODUCT LIFTING ALONG THE PRODUCTION STRING, AND A SELF-ALIGNING WELLHEAD SEAL SEALING DEVICE FOR SEALING THE WELLHEAD WHEN REPLACING STUFFING BOX SEALS 2021
  • Pokazanev Konstantin Vladimirovich
  • Shagidullin Ramil Rustemovich
RU2769792C1
METHOD FOR DETERMINATION OF TIGHTNESS OF DOWNHOLE EQUIPMENT FOR SIMULTANEOUS SEPARATE OPERATION 2019
  • Rizatdinov Rinat Faritovich
  • Kaiumov Robert Rafailevich
RU2720727C1
OIL WITH HIGH GAS CONTENT PRODUCTION METHOD FROM WELLS AND DEVICE FOR ITS IMPLEMENTATION 2017
  • Korabelnikov Mikhail Ivanovich
  • Korabelnikov Aleksandr Mikhajlovich
RU2667182C1
FITTINGS OF WELL-HEAD 1996
  • Abramov A.F.
RU2159842C2
HOLE SCREW PUMP WITH MOUTH DRIVE 2007
  • Badretdinov Atlas Misbakhovich
RU2338927C1
WELL MOUTH PACKER DEVICE 2002
  • Dzhafarov M.A.-O.
  • Gavrilin N.I.
  • Koljada N.M.
RU2231621C2
INSTALLATION OF BOTTOM-HOLE SCREW PUMP 2011
  • Valovskij Vladimir Mikhajlovich
  • Valovskij Konstantin Vladimirovich
  • Basov Georgij Jur'Evich
RU2461734C1
INSTALLATION OF SUCKER-ROD PUMP WITH PARALLEL PIPE STRINGS FOR OPERATION OF WELLS WITH INCREASED SAND PRODUCTION 2023
  • Bragin Dmitrii Viktorovich
  • Zairov Bulat Foatovich
  • Basos Georgii Iurevich
RU2815669C1

RU 2 517 304 C2

Authors

Mamakov Anatolij Vasil'Evich

Davletov Il'Giz Jasavievich

Tukhvatullin Ruslan Musovich

Dates

2014-05-27Published

2012-08-27Filed