FIELD: oil and gas industry.
SUBSTANCE: invention relates to oil-field equipment, particularly to downhole landing for dual production and injection. Landing includes two string of coaxially mounted tubing strings of different diameter, pump, device for separation of flows of pumped and extracted liquid, valve in the line of pumped liquid, packer for separation of the producing and injection of benches and wellhead equipment. As a pump used electric centrifugal pump. Device for separation of flows of pumped liquid is extracted above the pump. Between the pump and packer is installed moving unit in which is mounted load-carrying tube for passage of pumped fluid, connected in the upper part with fastener arranged at the device level for separation of flows of pumped and extracted liquid. Valve on the line of pumped fluid pumping is located below the packer, which is a part of the packer arrangement including disconnectors of columns, flushing and tubing anchor.
EFFECT: increasing of reliability and safety of operation, simplified mounting and possibility of oil production in a larger volume.
3 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
INSTALLATION FOR SIMULTANEOUS SEPARATE EXTRACTION AND INJECTION | 2019 |
|
RU2724712C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL DEPOSIT | 2017 |
|
RU2669950C1 |
METHOD OF INJECTION OF WATER IN THE SYSTEM OF SUPPORTING THE RESERVOIR PRESSURE IN WEAKLY PERMEABLE HEADERS | 2018 |
|
RU2676780C1 |
METHOD OF BOREHOLE TRANSFER AND UNIT FOR TRANSFER OF LIQUID FROM UPPER WELL FORMATION TO LOWER ONE WITH FILTRATION | 2011 |
|
RU2485293C1 |
INSTALLATION NAMED AFTER GARIPOV FOR OIL PRODUCTION WITH DUAL DISPOSAL OF BRINE WATER AND METHOD OF ITS IMPLEMENTATION (VERSIONS) | 2012 |
|
RU2534688C2 |
METHOD OF DETERMINING AIR-TIGHTNESS OF DOWNHOLE EQUIPMENT WITH DUAL EXTRACTION OF FLUIDS FROM WELL WITH SUCKER-ROD AND ELECTRIC-CENTRIFUGAL PUMP | 2015 |
|
RU2589016C1 |
METHOD FOR DEVELOPMENT OF SUPERVISCOUS OIL DEPOSIT USING PAIRED HORIZONTAL WELLS | 2023 |
|
RU2813873C1 |
METHOD OF CONTROLLING FORMATION OF ASPHALTENE SEDIMENTS DURING PRODUCTION OF HIGH POUR POINT ANOMALOUS OIL | 2021 |
|
RU2766996C1 |
METHOD FOR HYDROCHLORIC ACID TREATMENT OF THE BOTTOM-HOLE ZONE OF AN OIL RESERVOIR | 2022 |
|
RU2792124C1 |
METHOD OF BOREHOLE AND WELLHEAD EQUIPMENT LAYOUT FOR WELL SURVEY ENVISAGING INJECTION OF INJECTION FLUID TO FORMATION AND EXTRACTION OF FLUIDS FROM FORMATION | 2013 |
|
RU2531414C1 |
Authors
Dates
2016-10-10—Published
2015-09-30—Filed