FIELD: construction.
SUBSTANCE: invention relates to operation of permanent bridges on permafrost soils and can be used for permanent operated bridges with pile foundations, permafrost bases of which are used according to principle I. Method of forced lowering of permafrost soil temperature in bases of pile foundation foundations of operated bridge is performed with cold atmospheric air. Barrels of seasonal-action cooling devices (SCD) are blown by cold air from an air turbo-refrigerating machine after complete pumping of liquid coolant therefrom, which is again poured into boreholes of SCD after bases have reached calculated negative temperature values.
EFFECT: technical result consists in provision of forced lowering to design negative temperature values of permafrost soil in bases of pile foundation foundations of operated axle without changing structures of foundations and depth of piles immersion into thickness of permafrost soil of bases.
1 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR THERMOSTABILIZATION OF SOIL AROUND PILES | 2022 |
|
RU2786189C1 |
METHOD OF CONSTRUCTION AND INSTALLATION OF PILES IN PERMAFROST ZONES USING HEAT STABILIZATION COUPLINGS | 2023 |
|
RU2818341C1 |
METHOD FOR COMBINED YEAR-ROUND TEMPERATURE STABILIZATION OF SOIL | 2021 |
|
RU2761790C1 |
COMBINED METHOD OF ARRANGEMENT OF PILE FOUNDATIONS IN PERMAFROST SOILS | 2019 |
|
RU2712976C1 |
METHOD OF ARRANGEMENT OF FOUNDATION SLAB ON PILES FOR LOW-TEMPERATURE PRODUCT TANK | 2013 |
|
RU2552253C1 |
METHOD OF REDUCING EFFECT OF TANGENTIAL FROST HEAVING FORCES ON PILE FOUNDATIONS | 2023 |
|
RU2817932C1 |
METHOD FOR FREEZING AND MAINTAINING STABLE CONDITION OF PERMAFROST SOILS | 2023 |
|
RU2813272C1 |
DRILLING-AND-DRIVING METHOD FOR PILE FOUNDATION ERECTION IN PERMAFROST GROUND | 2006 |
|
RU2320821C1 |
METHOD FOR DETERMINING THE SPECIFIC RESISTANCE FORCES ON THE SIDE SURFACE OF THE FOUNDATION OF FROZEN SOILS AT DIFFERENT TEMPERATURES IN THE PROCESS OF THAWING AND APPARATUS FOR IMPLEMENTATION THEREOF | 2020 |
|
RU2761782C1 |
METHOD OF SUPPORTING MINE SHAFT COLLAR IN PERMAFROST ROCKS | 1996 |
|
RU2122119C1 |
Authors
Dates
2020-09-01—Published
2019-02-26—Filed