FIELD: drilling of soil or rocks; mining.
SUBSTANCE: invention relates to oil and gas industry, in particular, to drilling, construction and operation of wells at gas-condensate fields in the presence of formations with abnormally high formation pressure (AHFP). Method comprises preliminary drilling and construction of additional absorbing well. Drilling, casing and attachment of production well shaft is carried out to the roof of high-pressure water-bearing formation with AHFP with thermostating of column by creation in formed closed annular space between conductor and intermediate column of vacuum due to injection process by means of jet pump located in wellhead, as working agent for which well production is used. Performing drilling and controlled removal of formation water from high-pressure formation into absorption well due to formation energy till AHFP is reduced. Then drilling and well construction on hydrocarbon producing horizons are completed with inclusion of two sections into casing production string: opposite to high-pressure water-saturated formation and productive horizon to gas, made with perforated casing with holes, plugged with cut plugs. Perform simultaneous separate operation of high-pressure and gas-condensate horizons by equipping the well with downhole equipment, which involves lifting of formation water to day surface with downhole gas lift, their removal to the absorption well through the unit for extraction of valuable components.
EFFECT: provides for accident-free penetration of strata with AHFP, prevention of crash of well casing string during its operation at gas-condensate multilayer deposits and improvement of efficiency of deposit development due to integrated development of formation fluid.
4 cl, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR SIMULTANEOUS PRODUCTION OF FLUIDS PRONE TO TEMPERATURE PHASE TRANSITION | 2020 |
|
RU2740884C1 |
METHOD FOR OPENING HIGH-PRESSURE FORMATIONS SATURATED WITH STRONG BRINES | 2020 |
|
RU2735504C1 |
METHOD FOR WELL CONSTRUCTION IN COMPLICATED CONDITIONS | 2016 |
|
RU2630519C1 |
METHOD FOR REDUCTION OF HEAT EXCHANGE IN THE WELL AT DEVELOPMENT OF MULTILAYER DEPOSIT | 2015 |
|
RU2591325C9 |
METHOD OF CREATING SCREENING CURTAIN WHEN DRILLING HIGH-PRESSURE STRATA SATURATED WITH STRONG CHLORIDE-CALCIUM BRINES | 2020 |
|
RU2735508C1 |
METHOD OF MULTILAY FIELD DEVELOPMENT | 2012 |
|
RU2505667C1 |
CONSTRUCTION METHOD OF DEEP WELL, PLUGGING SOLUTION FOR ITS IMPLEMENTATION AND STRUCTURE OF DEEP WELL | 2008 |
|
RU2386787C9 |
OPENING METHOD OF HIGH-PRESSURE STRATUMS, SATURATED BY STRONG BRINES | 2007 |
|
RU2365735C2 |
WELL CONSTRUCTION METHOD | 2019 |
|
RU2720721C1 |
PROCEDURE FOR DEVELOPMENT OF MULTI-BED GAS-CONDENSATE DEPOSIT IMPLEMENTING TRANSPORTATION OF GAS VIA HIGH PERMEABLE FORMATION | 2008 |
|
RU2383719C1 |
Authors
Dates
2020-09-16—Published
2018-12-24—Filed