FIELD: construction.
SUBSTANCE: invention relates to hydraulic engineering, in particular to temporary mooring facilities, and can be used for rapid erection of mooring berths for reloading operations in coastal zone of rivers and seas with availability of railway infrastructure. Temporary mooring structure consists of two mutually anchored walls interconnected by links, and backfilling (3) between walls. Railroad open wagons (2) interconnected by links and forming U-shaped structure in plan are used as mutually anchored walls. After installation, flooding and attachment of U-shaped structure from railway open wagons (2) their space and space inside U-shaped structure is filled with compacted backfill (3) with reinforcing elements (4), which forms even strong surface of structure.
EFFECT: reduced labor costs, as well as time of erection and disassembly of mooring structure using materials of railway infrastructure.
3 cl, 10 dwg
Title | Year | Author | Number |
---|---|---|---|
MOORING FACILITY | 2020 |
|
RU2750985C1 |
TEMPORARY FLOATING BERTH | 2022 |
|
RU2782206C1 |
COLLAPSIBLE RAILWAY BRIDGE | 2021 |
|
RU2758302C1 |
METHOD OF CONSTRUCTION OF THE PORT HYDRAULIC STRUCTURE | 2017 |
|
RU2656399C1 |
HYDRAULIC STRUCTURE | 2022 |
|
RU2811911C2 |
CONTAINER FORTIFICATION CONSTRUCTION | 2022 |
|
RU2797515C1 |
TRANSPORT JUNCTION AND METHOD FOR CONSTRUCTION THEREOF | 2015 |
|
RU2587673C1 |
METHOD FOR THE CONSTRUCTION OF A HYDRAULIC STRUCTURE OF A NAVAL BASE | 2021 |
|
RU2775074C1 |
METHOD FOR RECONSTRUCTION OF THE WAY WITH PIONEER FILL WITH A SHEAR FILLER | 2020 |
|
RU2745313C1 |
METHOD OF CONSTRUCTING HYDRAULIC ENGINEERING STRUCTURE | 0 |
|
SU1418397A1 |
Authors
Dates
2020-09-24—Published
2020-03-24—Filed