FIELD: hydraulic engineering.
SUBSTANCE: invention is related to construction of berthing and fencing structures, mainly in deep sea areas. A two-row backfill gravity structure of a prefabricated structure is presented, which can be installed both on relatively soft soils and on semi-rocky and rocky rocks. The front walls of the structure are connected to each other by anchor systems consisting of crossbars on which the wall panels rest. Using rigid connections, the crossbars of the anchor systems are combined into a frame block, inside which flexible anchor rods are also placed, the strength of which is designed to withstand loads from the backfill soil. The ends of the flexible anchor rods are hinged on the crossbars of the anchor system. Wall panels consist of horizontally located tongue-and-groove profiles and end elements connecting them, which, together with the crossbars of the anchor system, form a strong locking connection. The proposed solution provides the possibility of its application for seaports of unlimited, in a practical range, depth, and in the broad aspect of changes in geological conditions of construction.
EFFECT: invention improves the reliability of the structure and the permissible height of its construction.
2 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONSTRUCTION OF THE PORT HYDRAULIC STRUCTURE | 2017 |
|
RU2656399C1 |
METHOD FOR CONSTRUCTION OF HYDRAULIC STRUCTURES ON ROCKY SOILS | 2023 |
|
RU2816995C1 |
METHOD FOR BUILDING PIER ON ROCK BASE AND PIER ON ROCK BASE OBTAINED BY THIS METHOD | 2020 |
|
RU2757733C1 |
METHOD FOR THE CONSTRUCTION OF A HYDRAULIC STRUCTURE OF A NAVAL BASE | 2021 |
|
RU2775074C1 |
METHOD FOR CONSTRUCTION OF A NAVAL BASE ON AN OPEN WATER | 2022 |
|
RU2797792C1 |
TEMPORARY MOORING STRUCTURE | 2020 |
|
RU2732938C1 |
MOORING FACILITY | 2020 |
|
RU2750985C1 |
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
BERTH AND METHOD OF ITS CONSTRUCTION | 2022 |
|
RU2794790C1 |
MOORING QUAY AND METHOD FOR ITS CONSTRUCTION | 1992 |
|
RU2032789C1 |
Authors
Dates
2024-01-18—Published
2022-01-17—Filed