FIELD: physics.
SUBSTANCE: inhibitor dosing unit comprises a main line and a bypass line, the main line comprising a pipeline and a first ball valve, a filter, a second ball valve, a solenoid two-way valve installed in series on its stroke, third ball valve, check valve, pressure gauge, fourth ball valve, bypass line includes pipeline and in-series installed on its stroke fifth ball valve, throttle pack, sixth ball valve, wherein bypass line begins with first branch from main line between filter and second ball valve, ends with second branch between third ball valve and check valve, and in the area of the first and the second branches there installed are pressure sensors with possibility to determine pressure in the main pipeline.
EFFECT: device provides reliability, dosed supply of inhibitor.
4 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
DOSING DEVICE FOR CORROSION AND HYDRATE INHIBITOR | 2022 |
|
RU2804451C1 |
COMPLEX AUTOMATION SYSTEM OF HYDRAT FORMATION IHYBITOR DISTRIBUTION AND DOSAGE | 2008 |
|
RU2376451C1 |
HYDRATE FORMATION INHIBITOR SUPPLY DEVICE | 2014 |
|
RU2559383C1 |
HYDRATE GROWTH INHIBITOR DELIVERY METHOD | 2014 |
|
RU2574159C2 |
SYSTEM AND METHOD FOR SHUT-OFF VALVES CLOSING OF UNDERWATER GAS FIELD | 2022 |
|
RU2783981C1 |
ICE FORMATION PREVENTION SYSTEM IN THE GAS GATHERING PIPELINE | 2021 |
|
RU2762323C1 |
SWITCHING DEVICE OF SAFETY VALVE BLOCK | 2022 |
|
RU2789956C1 |
FACILITY FOR CONTROL AND REGULATING OF PROCESS OF GAS PRODUCTION IN GAS AND/OR GAS CONDENSATE WELLS | 2007 |
|
RU2340771C1 |
CONTROL SYSTEM OF PROCESS GAS LOSSES OF GAS-DYNAMIC SEALS | 2012 |
|
RU2500926C2 |
INSTALLATION FOR STORAGE AND DOSED SUPPLY OF WORKING AGENTS TO PRODUCTIVE FORMATION | 2018 |
|
RU2704402C1 |
Authors
Dates
2021-01-12—Published
2020-07-07—Filed